Laserfiche WebLink
0li <br /> m <br /> 1 pl <br /> 00' <br /> 1 A.C. Transition 0.21 ' A.C. Overlay <br /> X11 0 <br /> OI D <br /> DI o • <br /> p 3 50' w <br /> 0 0 <br /> a o <br /> P o o I + + <br /> m <br /> + + <br /> + n n <br /> � N r(� <br /> \ ;------- JP ` Const. �JP �JP <br /> 37' 64 N 65 66 67 66 N <br /> I + <br /> a + + o <br /> A I I w E.P. <br /> g R <br /> a i n o <br /> � m 1 <br /> BEGINNING OF PROJECT <br /> 3 <br /> I I <br /> i I I <br /> � I <br /> o � <br /> (,f1EL GEND (�j) Place Survey Monument Frame and Cover. <br /> Refer to S.J. Co. Improvement Standards <br /> ® Variable Depth Asphalt Concrete Overlay. No. CW—M1. See Sheet No. 7 for detail. <br /> o '!; <br /> A � Limits of Asphalt Concrete Leveling Existing Survey Monument <br /> OU A Q• Adjust Monument Frame and Cover <br /> FO-0-01 Depth of Asphalt Concrete Pavement Planing. <br /> J ■ Limits of Asphalt Concrete Pavement Planing. <br /> 0 <br /> MURPHY ROAD IMPROVEMENTS Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE PLANS (Milgeo Avenue to River Road) 4 of 11 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL R 0 MENDED DATE <br /> T / o e 1 <br /> P. y 3 mG11 /Ptu.�wo ��03 /%� 3 <br />