Laserfiche WebLink
REMOVING CONCRETE SHOULDER BACKING <br /> Location Quantity Location Quantity <br /> Sta. 143+73 (Rt.) Driveway 34 S.Y. <br /> (30'x8') Sta. 120+30 to Sta. 243+87 5,209 Tons <br /> Sta. 154+40 (Rt.) Driveway 44 S.Y. <br /> (42'x8') <br /> Total 78 S.Y. PAVEMENT REPAIR <br /> Location Quantity <br /> PLANING ASPHALT Various locations 200 S.Y. <br /> CONCRETE PAVEMENT <br /> D Sta. <br /> Location <br /> 50 to Sta. 120+85 Qu 80 S.Y. <br /> DRIVEWAYS <br /> Sta. 242+62 to Sta. 242+97 93 S.Y. Type Number Area <br /> o „ Sta. 243+14 to Stu. 243+34 93 S.Y. <br /> 9 <br /> m Sta. 243+77 to Sta. 243+87 145 S.Y. D 7 Locations 278 S.Y. <br /> iAsphalt Concrete Frontage at the following locations E 22 Locations 909 S.Y. <br /> Sta. 149+50 to Sta. 151+25 (Rt.) 97 S.Y <br /> Sta. 158+45 to Sta. 160+00 (Rt.) 86 S.Y <br /> Stu. 175+60 to Stu. 178+00 (Rt.) 133 S.Y <br /> Stu. 175+60 to Stu. 182+40 (Lt.) 378 S.Y ASPHALT CONCRETE (TYPE B) <br /> Sta. 228+40 to Sta. 231+00 (Rt.) 144 S.Y <br /> Total 1,249 S.Y. Location Quantity <br /> Mainline 4,900 Tons <br /> Intersection 62 Tons <br /> ADJUST MONUMENT Driveways 32 Tons <br /> Pavement Repair 66 Tons <br /> C!` FRAME AND COVER <br /> Total 5,160 Tons <br /> 1 N <br /> Location Quantity <br /> Sta. 146+35 (1/4 Section Corner) 1 Each <br /> p ` <br /> N > Sta. 172+77 (Section Corner) 1 Each PAVEMENT REINFORCING FABRIC <br /> A Sta. 199+24 (1/4 Section Corner) 1 Each <br /> Sta. 225+70 (Section Corner) 1 Each Location Quantity <br /> J <br /> Total 4 Each Sta. 120+60 to Sta. 243+77 29,750 S.Y. <br /> z <br /> 0 <br /> FDR7AWN <br /> NTY OF SAN JOAQUIN rlo scaE SUMMARY OF QUANTITIES AUSTIN ROAD RESURFACING Sheet No. <br /> (West Ripon Road to Moffat Boulevard) 6 of 6 <br /> Y DATE PROJECT ENGINEER DATE CHE KED DATE APPROVAL RECOMMENDED DATE <br /> I6k03 I 1-4aG Z.« 1 /O z9/a3 ,O&, o a/ ,� /3s�Ol <br />