My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2910 - SP2919
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP2910 - SP2919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:26:48 AM
Creation date
1/23/2016 12:52:39 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Armstrong Road Improvements
Limits
West Lane to North 99 Frontage Road West
Year
2004
Project Engineer
Jeff Levers
Roads Worked
Armstrong Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP2910 - SP2919
DocCategory
Improvement Plans
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EP Conform ® E.P. <br /> 12" Standard frame and <br /> � '� 8' A.C. Overlay Dia. or Sq cover assembly <br /> .� 6" (Refer to S.J.Co. Std. <br /> Dwg. CW—M1.) <br /> Conform 4 <br /> Existing8"Width y Fl , <br /> 12' Min. Exist. Roadway P.C.C. ' ° 6" <br /> 3' m <br /> PE <br /> 0.30' Asphalt Concrete over shaped compacted native material. Undisturbed Exist. survey monument <br /> NOTE: Portion of existing concrete driveway and A.C. frontage shall be basement soil—/ to remain in place and <br /> removed from the edge of pavement to the distance listed below. undisturbed. <br /> Concrete shall be saw cut to provide a neat straight joint at the <br /> conform line. Removal of concrete shall be considered as included SURVEY MONUMENT DETAIL <br /> in the contract Lump Sum unit price for Clearing and Grubbing. <br /> 11' — Sta. 40+66 to Stu. 41+64 (Lt.) <br /> 10' — Stu. 42+25 (Rt.) <br /> i <br /> Conform ® E.P. <br /> n EP <br /> 3 *T PLANING ASPHALT CONCRETE PAVEMENT <br /> ti m R R 8 <br /> z + Location Quantity <br /> m Conform Sta. 5+36 to Sta. 5+48 181 S.Y. <br /> Existing Width <br /> Pearson Road Intersection 68 S.Y. <br /> 3Sta. 14+94 to Sta. 15+09 53 S.Y. <br /> 12' Min. Stu. 15+35 to Sta. 15+60 89 S.Y. <br /> TYPE E Micke Grove Road Intersection 89 S.Y. <br /> Variable depth Asphalt Concrete over existing paved driveway. Sta. 53+41 to Sta. 53+81 293 S.Y. <br /> R = Conform to Existing Radii. Total 773 S.Y. <br /> CP *Paved frontages to be paid for as Type E driveways: <br /> "D 6' — Sta. 27+00 to Sta. 28+35 (Lt.) <br /> 4' — Sta. 38+00 to Sta. 38+90 (Lt.) <br /> p � 8' — Sta. 40+13 to Sta. 41+39 (Rt.) EARTHWORK (MI <br /> SC. AREAS) <br /> N 10' — Sta. 42+00 to Sta. 42+11 (Rt.) <br /> A 8' — Sta. 42+39 to Sta. 43+97 (Rt.) Location Quantity <br /> Sta. 49+00 to Sta. 53+70 (Lt.) 5 Sta. <br /> TYPICAL DRIVEWAY DETAILS <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS AND ARMSTRONG ROAD IMPROVEMENTS sheet No. <br /> SUMMARY OF QUANTITIES (west Lane to North 99 Frontage Road West) sof to <br /> DRAWN BY DATE PROJECT ENGINEER DATE CH CKED DATE APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.