Laserfiche WebLink
EP Conform ® E.P. <br /> 12" Standard frame and <br /> � '� 8' A.C. Overlay Dia. or Sq cover assembly <br /> .� 6" (Refer to S.J.Co. Std. <br /> Dwg. CW—M1.) <br /> Conform 4 <br /> Existing8"Width y Fl , <br /> 12' Min. Exist. Roadway P.C.C. ' ° 6" <br /> 3' m <br /> PE <br /> 0.30' Asphalt Concrete over shaped compacted native material. Undisturbed Exist. survey monument <br /> NOTE: Portion of existing concrete driveway and A.C. frontage shall be basement soil—/ to remain in place and <br /> removed from the edge of pavement to the distance listed below. undisturbed. <br /> Concrete shall be saw cut to provide a neat straight joint at the <br /> conform line. Removal of concrete shall be considered as included SURVEY MONUMENT DETAIL <br /> in the contract Lump Sum unit price for Clearing and Grubbing. <br /> 11' — Sta. 40+66 to Stu. 41+64 (Lt.) <br /> 10' — Stu. 42+25 (Rt.) <br /> i <br /> Conform ® E.P. <br /> n EP <br /> 3 *T PLANING ASPHALT CONCRETE PAVEMENT <br /> ti m R R 8 <br /> z + Location Quantity <br /> m Conform Sta. 5+36 to Sta. 5+48 181 S.Y. <br /> Existing Width <br /> Pearson Road Intersection 68 S.Y. <br /> 3Sta. 14+94 to Sta. 15+09 53 S.Y. <br /> 12' Min. Stu. 15+35 to Sta. 15+60 89 S.Y. <br /> TYPE E Micke Grove Road Intersection 89 S.Y. <br /> Variable depth Asphalt Concrete over existing paved driveway. Sta. 53+41 to Sta. 53+81 293 S.Y. <br /> R = Conform to Existing Radii. Total 773 S.Y. <br /> CP *Paved frontages to be paid for as Type E driveways: <br /> "D 6' — Sta. 27+00 to Sta. 28+35 (Lt.) <br /> 4' — Sta. 38+00 to Sta. 38+90 (Lt.) <br /> p � 8' — Sta. 40+13 to Sta. 41+39 (Rt.) EARTHWORK (MI <br /> SC. AREAS) <br /> N 10' — Sta. 42+00 to Sta. 42+11 (Rt.) <br /> A 8' — Sta. 42+39 to Sta. 43+97 (Rt.) Location Quantity <br /> Sta. 49+00 to Sta. 53+70 (Lt.) 5 Sta. <br /> TYPICAL DRIVEWAY DETAILS <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS AND ARMSTRONG ROAD IMPROVEMENTS sheet No. <br /> SUMMARY OF QUANTITIES (west Lane to North 99 Frontage Road West) sof to <br /> DRAWN BY DATE PROJECT ENGINEER DATE CH CKED DATE APPROVAL RECOMMENDED DATE <br />