Laserfiche WebLink
q <br /> Cont st. <br /> Limits of Clearing and Grubbing <br /> o. Ell 16' <br /> m E 6' 20' Pavement Reinforcing Fabric 6' E <br /> T o Planing Area ( Planing Area o O <br /> o o \\�, <br /> o `— Vor. t Var U y <br /> N Vor. Val / <br /> 77\n�`.� <br /> o - - T <br /> -. - - - - - - - - - <br /> n m <br /> i 0.17' A.C. Overlay Exist. Roadway <br /> a <br /> � m Existing Curb and Gutter <br /> 19'-24': Sto. 0+29 to Sta. 6+19 (Lt.) to remain in place. (Typ.) <br /> 16'-20': Sto. 0+29 to Sto. 6+35 (Rt.) <br /> P <br /> O <br /> TYPICAL SECTION <br /> Sta. 0+29 to Sta. 26+69 <br /> a <br /> 0 <br /> GENERAL NOTES: <br /> 1. Street side Storm Drain Inlets will be protected from liquid runoff sediments and 5. Asphalt Concrete shall be placed as one (1) layer with pavement reinforcing <br /> chemical pollutant in a manner consistent with the requirements of the National fabric over existing or prepared surface. <br /> Pollution Discharge Elimination System (NPDES) General Construction Permit. <br /> 6. Water valve frames and covers shall be adjusted to finished grade by others. <br /> 2. Existing drainage facilities, fences, water valves, frames and covers, sprinkler <br /> heads, trees, shrubs, curb, gutter and sidewalk shall remain unless 7. Existing drainage facilities, fences, water volves, frames and covers, sprinklers, <br /> o otherwise noted on the plans. curb, gutter and sidewalk shall remain unless otherwise noted on the plans. <br /> i F 3. Handing grinding of asphalt concrete pavement will be required at locations B. The Contractor shall obtain on Encroachment Permit from Caltrans for <br /> p n where water valves and maintenance holes are within the planing limits, work within State's jurisdiction. <br /> --n m 4. Placement of Asphalt Concrete Surfacing Shall not Begin Until the Asphalt <br /> N o Concrete Used in Pavement Repair has been in place for 18 hours. <br /> L <br /> COUNTY OF SAN JOA UIN No SCALE TYPICAL SECTION AND NOTES oLNE AVENUE RESURFACING sheet 6 <br /> Q (State Highway Route 4 to Section Avenue) 2 of 6 <br /> DRAWN 7 DATE PROJECT ENGINEER I DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />