Laserfiche WebLink
PLANING ASPHALT CONCRETE PAVEMENT EARTHWORK (ROADWAY WIDENING) ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity Location Quantity <br /> Mainline: Ste. 14+00 to Ste. 40+00 (Lt.) 26 Ste. Mainline Resurfacing 2,478 Tons <br /> Ste. 0+25 to Ste. 0+50 89 S.Y. Ste. 14+00 to Ste. 40+00 (Rt.) 26 Ste. Intersections 49 Tons <br /> Ste. 87+75 to Ste. 88+00 64 S.Y. Driveways 187 Tons <br /> Int tion • Total 52 Ste. <br /> Orange Ave 44 S.Y. Roadway Widening 58 Tons <br /> Lemon Ave 69 S.Y. Total 2,772 Tons <br /> Combs Rd 62 S.Y. <br /> Vine Ave 62 S.Y. <br /> Total 391 S.Y. <br /> SHOULDER BACKING <br /> Location <br /> '" Ste. 0+25 to Ste. 88+00 2,558 Tons <br /> EARTHWORK (MISC. AREAS) ASPHALT CONCRETE <br /> (TYPE B LEVELING) <br /> Location Quantity Location Quantity <br /> Sta. 0+75 to Sta. 4+50 (Lt.) 3.75 Sta. Ste. 0+50 to Ste. 64+00 1,696 Tons <br /> S g Ste. 21+00 to Ste. 26+50 (Lt.) 5.50 Ste. <br /> g Ste. 48+50 to Ste. 52+00 (Lt.) 3.50 Sta. DRIVEWAYS (TYPE D) <br /> HZI Ste. 54+50 to Ste. 56+50 (Lt.) 2.00 Ste. <br /> T `" Ste. 67+00 to Ste. 71+00 (Lt.) 4.00 Ste. Location Quantity <br /> i Ste. 74+00 to Ste. 82+00 (Lt.) 8.00 Ste. 27 Locations 810 S.Y. <br /> G Ste. 2+00 to Ste. 5+00 (Rt.) 3.00 Ste. <br /> Ste. 14+50 to Ste. 16+50 (Rt.) 2.00 Ste. <br /> Ste. 17+50 to Ste. 18+50 (Rt.) 1.00 Ste. <br /> Ste. 20+00 to Ste. 24+25 (Rt.) 4.25 Ste. PLACE MONUMENT FRAME AND COVER <br /> g Ste. 40+50 to Ste. 48+00 (Rt.) 7.50 Ste. <br /> s Sta. 52+00 to Sta. 56+50 (Rt.) 4.50 Ste. Location Quantity <br /> Ste. 58+00 to Ste. 60+00 (Rt.) 2.00 Ste. DRIVEWAYS (TYPE E) Ste. 13+55t (Orange Ave.) 1 Each <br /> Ste. 66+30 to Ste. 76+00 (Rt.) 9.70 Ste. Sta. 53+46f (Combs Rd.) 1 Each <br /> v, Sta. 81+50 to Sta. 84+50 (Rt.) 3.00 Ste. Location Quantity Ste. 40+38t (Lemon Ave.) 1 Each <br /> p t <br /> Toal 63.70 Ste. 10 Locations <br /> $ 452 S.Y. Total 3 Each <br /> 7V <br /> s F <br /> � o <br /> COUNTY OF SAN JOAQUIN NO SCALE I SUMMARY OF QUANTITIES (RiverRoaAVENUE a Highway IMPROVEMENTS <br /> S Sheet fNo. <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE ��A�PPPR�WAL RECOMMENDED DATE <br /> C, mcort 2i ,t c./13/0�! 9�0 OAWkl 0 Of' <br />