Laserfiche WebLink
IE Connection Detail E Connection Detail D Place A.C. Ramp Z <br /> Refer to S.P. A77K Refer to S.P. A77K (2 Locations). See <br /> EP for details. for details. Details this sheet <br /> 21' <br /> rn <br /> 23 24 26 27 <br /> 16' - - _________ __— <br /> E 1 BRIDGE #29C 208 <br /> P0 <br /> 7ill NOT PART OF PROJECT - <br /> 50' 25' <br /> Place Terminal System (Type ET) Connection Detail E Connection Detail E <br /> Refer to S.P. A77M for details <br /> Refer to S.P. A77K Refer to S.P. A77K <br /> 8 (Typ. 4 Locations) for details. for details. <br /> Place Wood Posts Std. RAILING DETAILS © Post embedment shall be <br /> o Approach Railing Transition Note: Backfill cavity from existing rail post removal with as per Detail B per SP A77FA <br /> Refer to S.P. A77F & A77J Y 9 P P <br /> o for details. (Typ. 4 Locations) Imported Borrow, placed in 12" lifts thoroughly <br /> m moistened and mechanically compacted <br /> 3 z <br /> s <br /> i <br /> IIWmi- tilt J1=lr--- <br /> Existing ,moi ' I I toil ill IiIIIIJ hilt. <br /> 3 Guard Raill i..LLII;_I� Si�lla <br /> $ Metal Beam Guard Railing 2 �3 "lirllll r= <br /> (Parallel with A.C. Romp) <br /> i <br /> Refer to S.P. A77F & A77J 11 ii =.i <br /> for details. (Typ. 2 Locotions) .tl_ _ i= Earthwork <br /> ' l Intercept Pipe II Backfill <br /> Down Drain, - <br /> i 18" Wall repair end <br /> V ' N Var II l <br /> DRAINAGE OUTLET TYPE G.M.P. <br /> 0 <br /> t A.C. Dikei li .y,. Sta 30+95 (39' Lt, 0.20' Elev above ground) <br /> p m (Type C) k,_�>.__.� Clean and Construct 36" CSP Drainage Outlet Type GMP <br /> Exist. Bridge <br /> S � 12'-6" Variable Depth Asphalt Concrete Sidewalk with locking grate (SP D75A, D77A, D778) and connect <br /> M (A.C. Misc. Areas) to existing pipe downdroin. Payment for this shall be <br /> A.C. RAMP as "Clean and Construct Drainage Facilities", Lump Sum. <br /> COUNTY OF SAN JOAQUIN NO SCALE RAILING DETAILS HANSEN ROAD EMBANKMENT REPAIR sheet No. <br /> (interstate HighwayRoute 205 Overpass) 5 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER I pATg DATE I APPROVAL RECOMMENDED DATE <br /> was•�wa/Lei 6/Uf � p� <br />