Laserfiche WebLink
Const. PAVEMENT REPAIR <br /> Limits of Clearing and Grubbing <br /> IT Location Quantity <br /> 28 Locations 392 S.Y. <br /> 1 ' Var.-2� �i�--Vac Varo �i�Vac� 1 ' <br /> Var. Var. V <br /> 0.04' A.C. ar. <br /> `V=r. +� <br /> 0.04' A.C. <br /> Existing Roadway 77,tspat oncrete Overlay PLANING ASPHALT <br /> CONCRETE PAVEMENT <br /> 3❑ Limits of Mailbox relocation. TYPICAL SECTION Location Quantity <br /> v <br /> 0 <br /> 7th Street <br /> m 7 Sta. 10+78 to Sta. 10+93 58 S.Y. <br /> ASPHALT CONCRETE PAVING WIDTH <br /> ti LEFT SIDE - RIGHT SIDE Sta. 21+00 to Sta. 21+41 408 S.Y. <br /> Laurel Street <br /> j o <br /> ROAD NAME LOCATION 1❑MAINLINE 0 SHOULDER 1UMAINLINE 0 SHOULDER Sta 10+40 to 10+55 103 S.Y. <br /> D ti o <br /> Ash St. Sta. 10+40 to Sta. 17+55 12' 5' 12' 5' Ash Street <br /> loo m Sta. 10+40 to 10+55 85 S.Y. <br /> A zLaurel St. Sto. 10+40 to Sta. 17+78 13' 8' 13' 8' Total: 654 S.Y. <br /> A <br /> N j � <br /> o x m <br /> z Seventh St. Sta. 10+50 to Sta. 21 +41 12.5' 5' 12.5' S' <br /> A <br /> L7 m <br /> D � <br /> M o D St. Sta. 15+65 to Sta. 18+10 - 8' - - <br /> z <br /> v � <br /> x <br /> rn <br /> GENERAL NOTES ASPHALT CONCRETE <br /> 4 w♦ ? <br /> 1. The contractor shall obtain a no fee encroachment permit yet 1_s3a. ' HC � "! ` ..iri'•hv+ t` (Type B) <br /> from the City of Stockton for work and traffic control within Location Quantity <br /> the city's right-of-way. <br /> MAINLINE <br /> u, 2. The existing drainage facilities located within the limits 7th Street 424 Tons <br /> of Clearing and Grubbing shall not be disturbed or - This f fd 'a �,;,.. , Laurel Street 333 Tons <br /> o obstructed by the Contractors operation unless Ash Street 272 Tons <br /> p n otherwise noted on the plans. <br /> J'' m D Street 34 Tons <br /> �A A 3. Water valves, frames and covers, shall be adjusted to grade <br /> by others after the completion of the resurfacing project. PAVEMENT REPAIR 90 Tons <br /> M <br /> v Total: 1 ,153 Tons <br /> o <br /> COUNTY OF SAN JOAQUINNo SCALE TYPICAL SECTIONAND QUANTITIES MORRISON GARDENS RESURFACING (PHASE 6) 53eof 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />