Laserfiche WebLink
PAVEMENT REPAIR ASPHALT CONCRETE (TYPE B) PAVEMENT REINFORCING FABRIC <br /> Location Quantity Location Quantity <br /> WEST JACKSON HEIGHTS: Location Quantity <br /> WEST JACKSON HEIGHTS: Funston Avenue 981 TONS <br /> Funston Avenue 317 S.Y. Sanguinetti Lane <br /> Onvood Street 89 S.Y. <br /> Orwood Street 502 TONS Sta. 10+70 to Sta. 35+85 6,707 S.Y. <br /> Bishop Street 4 S.Y. Bishop Street 463 TONS <br /> Sanguinetti Lane 78 S.Y. Stewart Street 145 TONS <br /> Sanguinetti Lane 1 ,470 TONS <br /> ALPINE HEIGHTS: <br /> E Street 19 S.Y. ALPINE HEIGHTS: <br /> ret 79 S.Y. E Street 732 TONS <br /> Redwood Avenue 41 S.Y. Belvedere Avenue 578 TONS 24 INCH DIAMETER STORM <br /> F Street 869 TONS DRAIN INLET <br /> Project Totals: 627 S.Y. Redwood Avenue 847 TONS <br /> Robindale Avenue 459 TONS Location Quantity <br /> SHOULDER BACKING <br /> Mainline: 7,046 TONS F Street <br /> Location Quantity Sta. 38+50 (+14' Lt.) 1 EACH <br /> n Pavement Repair: 209 TONS <br /> o Sanguinetti Lane 239 TONS Driveways: 270 TONS <br /> -, E Street 77 TONS Asphalt Concrete (Mist. Areas 14 TONS <br /> r <br /> D Belvedere Avenue 90 TONS Project Totals: 7,539 TONS 24 INCH DIAMETER STORM <br /> m F Street 131 TONS DRAIN INLET FRAME AND GRATE <br /> Redwood Avenue 86 TONS <br /> Robindale Avenue 68 TONS Location Quantity <br /> Total 691 TONS ASPHALT CONCRETE <br /> (MISCELLANEOUS AREAS) F street <br /> Sta. 38+50 (t14' Lt.) 1 EACH <br /> DRIVEWAYS Location Quantity <br /> Type D Type E Funston Avenue 19.0 S.Y. <br /> Street No. Area No. Area Orwood street 1.7 S.Y. * 12 INCH DIAMETER ALTERNATE PIPE <br /> 17) Bishop Street 3.3 S.Y. <br /> Sanguinetti Lane 6 209 S.Y. 3 169 S.Y. Location Quantic <br /> 1 Stewart Street 2.0 S.Y. y <br /> E Street 22 248 S.Y. 8 100 S.Y. <br /> o Belvedere Avenue 26 309 S.Y. 14 234 S.Y. Sanguinetti Lane 7.8 S.Y. <br /> nF Stree 0.7 S.Y. F Street <br /> m F Street 33 370 S.Y. 28 221 S.Y. Sto. 38+45 to Sta. 38+48 (t14' Lt.) 3 L.F. <br /> A Redwood Avenue 24 303 S.Y. 23 305 S.Y. F Street <br /> Robindale Avenue 16 236 S.Y. 19 155 S.Y. Sta. 38+35 to Sta. 38+64 (Lt.) 18 S.Y. <br /> * Concrete Reinforced Pipe —Class 3 <br /> z Total 127 1,675 S.Y. 95 1,184 S.Y. Project Totals: 52.5 S.Y. * Corrugated Steel Pipe (0.109' Thick) <br /> * Polyvinyl Chloride Pipe (PVC) <br /> COUNTY OF SAN JOAQUIN I NO SCALE I SUMMARY OF QUANTITIES WEST JACKSON HEIGHTS/ALPINE HEIGHTS RESURFACING 21eof 22 <br /> DRAWN BY DATE PROJECT ENGINEER DATE C CKED DATESUBMITT DATE AAPPROV/AL RECOMMENDED DATE <br /> %«. o/ir/y QQ o � f L 1/IQKta✓ <br />