My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3007 - SP3015
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3007 - SP3015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:31:39 AM
Creation date
1/23/2016 12:54:37 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Furry Road/Hogan Lane Resurfacing
Limits
(Live Oak Road to Hogan Lane) (N 99 Frontage Road East to Angier Road)
Year
2004
Project Engineer
Jeff Levers
Roads Worked
Furry Rd., Hogan Ln.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP3007 - SP3015
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CL <br /> Const. Limits of Clearing and Grubbing Const. <br /> and Mailbox Relocation <br /> Limits of Clearing and Grubbing and Mailbox Relocation <br /> 10 10 Conform <br /> See I See <br /> Shoulder 18' Shoulder Vor. �8%. <br /> Details Pavement Reinforcing Fabric Detailsthis Sheet I this Sheet - - - <br /> Var. Var., <br /> Shoulder Backing — — — <br /> SHOULDER DETAIL 1 <br /> Existing Roadway Asphalt Concrete Overlay rL <br /> TYPICAL SECTION See Plans for Thickness Variation Const. <br /> FURRY ROAD Sta. 0+80 to Sta. 26+07 Limits of Clearing and Grubbing <br /> Sta. 27+45 to Sta. 52+82 and Mailbox Relocation <br /> HOGAN LANE Sta. 0+12 to Sta. 89+75 <br /> a 4' 10't <br /> GENERAL NOTES: Conform <br /> 8 1. Contractor shall scarify native soil adjacent to pavement at intersection Var. <br /> radii to a depth of 6 and blend Shoulder Backing material prior to SHOULDER SCHEDULE '- <br /> 3 compaction. Limits of this work shall be confined to intersection radii — — — <br /> plus 50 feet in each direction. Payment for blending shall be considered FURRY ROAD L _ — <br /> a n as included in the price for Shoulder Backing. <br /> 6 2. All earthwork (except for final shoulder grading) shall be completed prior LEFT RIGHT Shoulder Backing <br /> v to placing final lift of asphalt concrete. No Shoulder Backing shall be Station to Station Detail Station to Station Detail SHOULDER DETAIL 2 <br /> deposited or drifted on the final lift of asphalt concrete surfacing. 0+80 to 17+78 1 0+80 to 11+00 1 <br /> o Where the Shoulder Backing placement exceeds 0.30' in thickness, 17+78 to 26+07 2 11+00 to 26+07 2 <br /> m the Shoulder Backing shall be placed in two fully compacted layers. 27+45 to 40+00 1 27+45 to 52+82 1 <br /> 3. Asphalt Concrete shall be placed as noted below with pavement reinforcing 40+00 to 52+82 2 Limits of Clearing and Grubbing Const. <br /> fabric placed on existing pavement: HOGAN LANE and Mailbox Relocation <br /> 0.12' or 0.17' Thickness 0+12 to 10+30 2 0+12 to 7+75 2 <br /> $ One (1) layer over existing surface. M324 12+40 3 7+75 to 19+15 1 Earthwork (Misc. Areas <br /> 0 25' or 0 40' Thickness 16+00 2 19+15 to 35+50 2 <br /> Two (2) layers of approximate equal thickness. 18+65 135+50 to 75+50 1 1 4' 2' 10't <br /> 4. All existing trees, shrubs, fences and other frontage improvements are 20+00 2 75+50 to78+50 3 <br /> to remain in place unless otherwise noted. 23+75 3 78+50 to 85+25 1 Conform <br /> 5. 2' Top Soil shall be used in place of Shoulder Backing at the following 25+50 2 85+25 to89+75 2 <br /> locations on Hogan Lane: 38+30 3 Sta. 66+80 to Stu. 68+50 Lt.) 49+45 1 <br /> v Sta. 72+85 to Sta. 73+15 Rt.) 49+45 to s9+25 3 IIL—Iii <br /> f Sta. 75+50 to Sta. 78+50 Rt.) 59+25 to 74+00 1 L <br /> i <br /> n Where Top Soil is required it shall conform to the requirements of 1 74+00 to 85+00 2 Shoulder Backing <br /> O m Section 20-2.01 "Top Soil' of the Standard Specifications, see I 85+00 to 87+35 3 <br /> m Special Provision 19S. 1 87+35 to 89+75 1 2 SHOULDER DETAIL 3 <br /> � o <br /> COUNTY OF SAN JOAQUINNO SCALE TYPICAL SECTIONS FURRY ROAD/HOGAN LANE RESURFACING Sheet No. <br /> AND GENERAL NOTES (Live Oak Road to Hogan Lane; N 99 Frontage Road East to Angier Road) 2 of 9 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.