My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3033 - SP3040
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3033 - SP3040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:32:49 AM
Creation date
1/23/2016 12:55:11 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Oleander Avenue/Nile Avenue Resurfacing
Limits
(Nile Avenue to Woodward Avenue) (Airport Way to Union Road)
Year
2005
Project Engineer
Jeff Levers
Roads Worked
Oleander Ave., Nile Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP3033 - SP3040
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR DRIVEWAYS (TYPE E) EARTHWORK <br /> Location Quantity Location Quantity (ROADWAY WIDENING) <br /> 4 Locations (Throughout Project) 297 S.Y. Oleander Avenue LOCatlon Quantity <br /> 22 Location 840 S.Y. <br /> Oleander Avenue <br /> Nile Avenue Ste. 11+50 to Ste. 34+65 (Lt.) 23.15 Ste. <br /> PLANING ASPHALT CONCRETE PAVEMENT 24 Locations 863 S.Y. Ste. 11+50 to Ste. 34+65 (Rt.) 23.15 Ste. <br /> LocationTotal 1,703 S.Y. Ste. 38+25 to Ste. 61+06 (Lt.) 22.81 Ste. <br /> QUantlty Sta. 38+25 to Ste. 61+06 (Rt.) 22.81 Stu. <br /> Oleander Avenue Ste. 64+56 to Ste. 84+66 (Lt.) 20.10 Ste. <br /> Sta. 35+15 to Ste. 35+65 171 S.Y. <br /> Stu. 64+56 to Ste. 84+66 (Rt.) 20.10 Ste. <br /> Ste. 37+15 to Stu. 37+65 111 S.Y. Total 132.12 Ste. <br /> Ste. 61+50 to Ste. 62+00 111 S.Y. <br /> Ste. 63+60 to Ste. 64+10 111 S.Y. <br /> Ste. 84+77 to Ste. 85+02 193 S.Y. <br /> Nile Avenue DRIVEWAYS (TYPE F) <br /> Ste. 0+40 to Stu. 0+65 56 S.Y. ASPHALT CONCRETE (TYPE B) <br /> Ste. 39+52 to Stu. 45+65 (Rt.) 272 S.Y. Location Quantity Location <br /> i Ste. 52+70 to Stu. 52+95 56 S.Y. Quantity <br /> a Nile Avenue Oleander Avenue Resurfacing 2,664 Tons <br /> Total 1,021 S.Y. Ste. 39+52 to Ste. 45+65 (Rt.) 749 S.Y. Nile Avenue Resurfacing 1,929 Tons <br /> 88 Pavement Repair 99 Tons <br /> Driveways (Type D,E & F) 475 Tons <br /> s SHOULDER BACKING Roadway Widening 190 Tons <br /> 's Location Quantity Total 5,357 Tons <br /> � Oleander Avenue <br /> M Ste. 8+25 to Ste. 85+02 1,035 Tons EARTHWORK <br /> Nile Avenue <br /> Sta. 0+40 to Sta. 51+95 732 Tons (MISCELLANEOUS AREAS) PAVEMENT REINFORCING FABRIC <br /> Total 1,767 Tons Location Quantity Location Quantity <br /> Oleander Avenue Nile Avenue <br /> Ste. 12+00 to Ste. 20+25 (Rt.) 8.25 Ste. Ste. 0+65 to Ste. 51+70 10,210 S.Y. <br /> DRIVEWAYS (TYPE D) Ste. 29+80 to Stu. 35+65 (Rt.) 5.85 Ste. <br /> s Ste. 41+00 to Ste. 46+50 (Rt.) 5.50 Ste. <br /> Location Quantity Ste. 63+60 to Ste. 70+50 (Rt.) 6.90 Stu. <br /> a Ste. 84+52 to Stu. 85+02 (Lt.) 0.50 Ste. <br /> Oleander Avenue Nile Avenue PLACE MONUMENT FRAME AND COVER <br /> r w 25 Locations 903 S.Y. Ste. 28+15 to Ste. 33+50 (Lt.) 5.35 Ste. <br /> t` y Nile Avenue Location Quantity <br /> 8 Locations 273 S.Y. Ste. 39+00 to Ste. 46+00 (R <br /> Lt.) QUantl 7.00 Ste. <br /> 1 Oleander Avenue <br /> Total 1,176 S.Y. <br /> w m Total 43.95 Sta. Sta. 9+98 (5' Lt.)t 1 Each <br /> A <br /> zi <br /> I <br /> W z <br /> W COUNTY OF SAN JOAQUIN SUMMARY OF QUANTITIES OLEANDER AVENUE/NILE AVENUE RESURFACING sheet No. <br /> NO SCALE (Nile Avenue to Woodward Avenue; Airport Way to Union Road) i of 8 <br /> DRAWN D'r DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL R COMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.