My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3052 - SP3057
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3052 - SP3057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:33:56 AM
Creation date
1/23/2016 12:55:35 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Howard Road Resurfacing
Limits
Tracy Boulevard to 900' +/- West of Undine Road
Year
2005
Project Engineer
Kaila Coppal
Roads Worked
Howard Rd.
Red Lines
Yes
Supplemental fields
Cross Ref
SP3052 - SP3057
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ChIW. <br /> Limits of Clearing and Grubbing <br /> and Mailbox Relocation COt C°VA9t Earthwork <br /> See Shoulder i See Shoulder 2 4' 16'��-� , <br /> Misc. Areas) <br /> -x^-16' 4' 4' <br /> 1 Details 16 18 Details 1 Finished Surface I I Conform <br /> 30' Pavement Reinforcing Fabric i ,Finished Surface <br /> -20 <br /> Conform <br /> Shoulder Backing Existing Roadway Existing Roadway <br /> I Existing Roadway Shoulder Backing (Typ.) <br /> ---------------1----t---------J <br /> 0.17' A.C. Overlay SHOULDER DETAIL A SHOULDER DETAIL B <br /> TYPICAL SECTION <br /> Stu. 0+17 to Sto.109+50 <br /> IF <br /> Const <br /> GENERAL NOTES <br /> �� SHOULDER SCHEDULE ��-16'� a' z'—a• <br /> a <br /> i 1. The Asphalt Concrete (0.17' resurfacing) shall be LOCATION A B C I Finished Surface <br /> a placed in one (1) layer with pavement reinforcing Sta. 0+17 to Sta. 8+00 Lt. @ Rt. Conform <br /> o ' fabric placed on existing or prepared surface. Sta. 8+00 to Sta. 12+00 (Lt. & Rt.) I 'A+ 1�r_ <br /> n <br /> A '-' 2. All Pavement Repair must be completed 24 Sta. 12+00 to Sta. 18+00 (Lt. k Rt.) <br /> g `^ hours prior to placement of Asphalt Concrete. Sta. 18+00 to Sta. 23+00 (Lt & Rt.) + --� <br /> o. P p P Existing Roadway Shoulder 23+00 to Stu. 29+00 Shoulder Backing (Typ.) <br /> m 3. Shoulder Backing material at all radii shall be blended Stu. 81+50 to Stu. 84+43 <br /> with the top 6' of native material as directed by the Engineer. LOCATIONA B SHOULDER DETAIL C <br /> Limits of this work shall be confined to intersection radii plus <br /> i50' each direction. Payment for blending shall be considered as Sta. 29+00 to Sta. 30+50 <br /> c included in the unit price paid for Shoulder Backing. Stu. 30+50 to Sto. 44+00 (Lt.) <br /> i Sta. 44+00 to Sta. 48+00 (Lt.) / <br /> 4. All earthwork (except for final lift of shoulder backing) Sta 48+00 to Stu. 50+50 (Lt.) I V <br /> shall be completed prior to placing final layer of asphalt Stu. 50+50 to Sta. 52+00 (Lt.) ' V <br /> concrete. No Shoulder Backing Material shall be deposited Sta. 52+00 to Sto. 61+50 (Lt.) V <br /> or drifted on the final lift of asphalt concrete surfacing. Sto. 84+43 to Stu.-109+50 (Lt.) V Z <br /> 5. The contractor shall conduct the Shoulder Backing operations LOCATION A B C z No. 38 65 <br /> ♦ Epp. Y31-05 + <br /> so as not to disturb or obstruct any existing drainage. Sta. 29+00 to Sta. 41+00 Rt. V <br /> �r <br /> y 6. Removal of A.C. Dikes where shown on the plans shall be done Sta 41+00 to Sta. 44+00 (Rt.) V Cr <br /> CIVIL <br /> cin such manner as not to damage surface beneath dike. Sta 44+00 to Sta. 50+50 (RtJ V _ CN>F <br /> $ Payment for Dike removal and disposal shall be considered as included Stu. 50+50 to Sto. 81+50 (RL) V -- <br /> __. <br /> AE in the contract Lump Sum unit price for Clearing and Grubbing. Sta. 84+43 to Sta. 99+00- (Rt.) _ _ _V_ n <br /> 7. An existing gas pipeline runs along Howard Road, <br /> Sta. 99+00 to Sta.102+00 (Rt) V �1 <br /> Q approximately 6' north of the Edge of Pavement. I Sta. 102+00 to Sta.109+50 (Rt.) V Peter D. Martin <br /> P <br /> RCE 38465 <br /> COUNTY OF SAN JOAQUIN No scALE TYPICAL SECTION HOWARD ROAD RESURFACING Sheet 6 <br /> (Tracy Boulevard to 900'± West of Undine Road) 2 of 6 <br /> DRAWN By DATE I PROJECT ENGINEER DATE CHECKED DATE I APPROVAL RECOMMENDED DATE <br /> �en/rfatvffvae°atd 01/05 .Kd. u G.( r/10/o1- I h°(° �a! <br />
The URL can be used to link to this page
Your browser does not support the video tag.