Laserfiche WebLink
ASPHALT CONCRETE (TYPE B) ASPHALT CONCRETE (TYPE B) PLACE MONUMENT <br /> Location Quantity LEVELING FRAMES & COVERS <br /> Andrea Avenue Location Quantity Location Quantity <br /> Mainline 406 TONS Andrea Avenue <br /> Driveways 37 TONS Sta. 16+91± Caran Avenue 1 EACH <br /> Pavement Repair 88 TONS Sta. 00+62 to Sta. 07+27 79 TONS Sta. 17+46t Caran Avenue 1 EACH <br /> Sta. 08+49 to Sta. 12+85 52 TONS <br /> Caron AvenuSta. 02+06t Leaf Avenue 1 EACH <br /> e Caron Avenue <br /> Mainline 393 TONS Sta. 11+05 to Sta. 13+50 29 TONS Sta. 01+17± St. Carlo Avenue 1 EACH <br /> Driveways 42 TONS Sta22+83 to Sta. 27+00 49 TONS Sta. 08+08t St. Carlo Avenue 1 EACH <br /> . <br /> Pavement Repair 519 TONS Sta. 09+72t St. Carlo Avenue 1 EACH <br /> Joan AvenuJoan Avenue <br /> e Sta. 27+00 to Sta. 29+50 30 TONS <br /> Mainline 96 TONS Total 6 EACH <br /> Driveways 11 TONS Edon Avenue <br /> Pavement Repair 39 TONS Sta. 01+85 to Sta. 09+35 89 TONS <br /> Edan Avenue <br /> Mainline 313 TONS Leaf Avenue <br /> Driveways 27 TONS Sta. 00+60 to Sta. 02+50 23 TONS <br /> c Pavement Repair 62 TONS <br /> .0 > Leaf Avenue <br /> Mainline 97 TONS Total 351 TONS <br /> o Driveways 16 TONS <br /> R Pavement Repair 42 TONS <br /> St. Carlo Avenue <br /> M Mainline 281 TONS <br /> i Driveways 18 TONS PAVEMENT REINFORCING FABRIC <br /> 3 Pavement Repair 624 TONS <br /> o Total 3,111 TONS Location Quantity <br /> Andrea Avenue 2,392 S.Y. <br /> TEMPORARY SILT FENCE Caran Avenue 1,324 S.Y. <br /> Location Quantity Joan Avenue 660 S.Y. <br /> Caron Avenue: <br /> Edan Avenue 1'520 S.Y. <br /> o Sta. 10+67 to Sta. 10+92 (Rt.) 50 Leaf Avenue 520 S.Y. <br /> L Sta. 10+67 to Sta. 10+92 (Lt.) 60 <br /> 0 Total 110 LF. <br /> Total 6,416 S.Y. <br /> FnFn <br /> Z9 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES OAKRIDGE SUBDIVISION STREETS RESURFACING Sheet No. <br /> (Various) 13 of 13 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECO <br /> CKED DATE APPROVAL REMMENDED DATE <br />