Laserfiche WebLink
REMOVING CONCRETE DRIVEWAYS PLACE SURVEY MONUMENT <br /> Location Quantity Type Quantity FRAME AND COVER <br /> Dustin Road Sta. 05+17t Lump Sum No. Area Location Quantity <br /> D 45 493 S.Y. Sta. 30+02t (2' Rt.) 1 Each <br /> E 34 409 S.Y. * Sta. 43+21± (1' Rt.) 1 Each <br /> PAVEMENT REPAIR Sta. 69+67f (CL) 1 Each <br /> * Sta. 96+15t (4' Lt.) 1 Each <br /> Location Quantity * Sta. 109+38f (8' Lt.) 1 Each <br /> ASPHALT CONCRETE (TYPE A) Sta. 122+63t (1' Lt.) 1 Each <br /> 21 Locations 84 S.Y. * Sta. 148+73f (1' Rt.) 1 Each <br /> Location Quantity Sta. 174+84t (1' Rt.) 1 Each <br /> Mainline 6,073 Tons Not Shown in Plans Total 8 Each <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT ASPHALT CONCRETE (TYPE B) <br /> Location Quantity <br /> Location Quantity <br /> Mainline: <br /> Sta. 21+50 to Sta. 21+75 58 S.Y. Intersections 104 Tons <br /> FA <br /> Sta. 70+22 to Sta. 70+72 117 S.Y. Driveways 144 Tons <br /> D Sta. 122+07 to Sta. 123+00 217 S.Y. Pavement Repair 30 Tons <br /> c Sta. 175+75 to Sta. 176+25 117 S.Y. Pavement Repair Minor Structure 5 Tons <br /> � Intersections: <br /> Leveling 147 Tons <br /> c FnKennefick Road 123 S.Y. Total 430 Tons <br /> a Dustin Road 123 S.Y. <br /> m <br /> Bruella Road 108 S.Y. <br /> JD <br /> Total 863 S.Y. <br /> CLASS A CONCRETE <br /> rt (MINOR STRUCTURE) <br /> 3 <br /> SHOULDER BACKING Location Quantity <br /> Location Quantity Sta. 5+17f (Dustin Road) 9.5 C.Y.(F) <br /> (� (F)= Final pay quantity <br /> v� Sta. 21+50 to Sta. 176+25 2,570 Tons <br /> EARTHWORK PAVEMENT REINFORCING FABRIC <br /> MISCELANEOUS AREAS <br /> Location Quantity <br /> rn <br /> Location Quantity <br /> Sta. 22+00 to Sta. 70+17 10,169 S.Y. <br /> M Sta. 70+72 to Sta. 175+25 22,279 S.Y. <br /> M Sta. 79+00 to Sta. 83+00 (Rt.) 4 Stations Total 32,448 S.Y. <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN No SOPLE =SUMMARY OF QUANTITIES JAHANT ROAD RESURFACING sheet <br /> (North 99 Frontage Road East to Bruella Road) 9 of 9 9 <br /> DRAWN BY DATE PROJECT ENGINEER 7DA71 CHECKED DATE APPROVAL R COMMENDED DATE <br />