My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3091 - SP3096
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3091 - SP3096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:36:00 AM
Creation date
1/23/2016 12:56:36 AM
Metadata
Fields
Template:
Small Plans - SP
Project
French Camp Road Resurfacing
Limits
Austin Road to Jack Tone Road
Year
2005
Project Engineer
Jeff Levers
Roads Worked
French Camp Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP3091 - SP3096
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> I <br /> Limits of Clearing and Grubbing <br /> and Mailbox Relocation <br /> 12 4 4 <br /> 4' 41 * ' ' 1 ' * ' ' <br /> 4 12 4P <br /> 24Pavement Reinforcing Fabric <br /> E <br /> L- Var. Var.,. E <br /> . t- <br /> o 5% 5 0 <br /> C -.9ff- <br /> 87. 0 <br /> 'q C) <br /> j <br /> Exist. Roadway 0.25' Asphalt <br /> Variable Depth Shoulder Backing Concrete Overlay Minimum 0.10' thick <br /> over Embankment (Typ.) <br /> Shoulder Backing (Typ.) <br /> See Note 7 below for details. <br /> TYPICAL SECTION <br /> Sta. 303+75 to Sta. 451 +90 Paved Shoulder slopes shall conform <br /> to existing surface at all intersections. <br /> 3 <br /> M <br /> M <br /> GENERAL NOTES: <br /> 1. 0.25' Asphalt Concrete Surfacing shall be placed in two (2) layers of approximate 5. All earthwork, except final grading of the shoulders, shall be completed prior to <br /> equal thickness with Pavement Reinforcing Fabric placed on existing surface. placing final layer of asphalt concrete. No Shoulder Backing shall be deposited <br /> =r <br /> 2 2. Placement of Asphalt Concrete Overlay shall not begin until the Asphalt Concrete <br /> or drifted on the final lift of asphalt concrete surfacing <br /> 3 <br /> used in Pavement Repair has been in place for 18 hours. 6. All existing frontage improvements shall remain in place unless otherwise noted. <br /> k <br /> -0 3. Shoulder Backing at all intersection radii shall receive Penetration Treatment 7. Excavated material generated by Pavement Repair and Planing Asphalt Concrete <br /> 2r within 4 feet of the Edge of Pavement as specified in the Special Provisions Pavement shall be thoroughly pulverized and used as Embankment. All material <br /> and as directed by the Engineer. shall be evenly distributed on both sides of the roadway between Sta. 308+00 <br /> 4. The Contractor shall conduct Shoulder Backing operations so as not to disturb and Sta. 448+00 and blended with the top 6" of native material in the Shoulder <br /> or obstruct any existing drainage. Backing and Embankment area. The cost paid for Earthwork (Miscellaneous Areas) <br /> shall include full compensation for onsite hauling, blending, shaping and compacting. <br /> d% <br /> W M <br /> M <br /> OZI <br /> r, <br /> M <br /> Z <br /> 0 COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION AND FRENCH CAMP ROAD RESURFACING Sheet No. <br /> I I <br /> GENERAL NOTES (Austin Road to Jack Tone Road) 2 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE /& CHECKED DATE APPROVAL RECOMMENDED DATE <br /> -7 � <br /> W <br /> Vincent Via' c4caros 94;f—� /14/01� _ 7AAA�— <br />
The URL can be used to link to this page
Your browser does not support the video tag.