My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3123 - SP3137
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3123 - SP3137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:37:37 AM
Creation date
1/23/2016 12:57:36 AM
Metadata
Fields
Template:
Small Plans - SP
Project
East Stockton Streets Phase 6 & Manteca Area Streets Resurfacing
Limits
Anteros Avenue, Hinkley Avenue, Olive Avenue, Guernsey Avenue, Drake Avenue, Eleanor Avenue, Cottage Avenue, Summer Home Drive and Jeane Road
Year
2006
Project Engineer
Kaila Coppal
Roads Worked
Anteros Ave., Hinkley Ave., Olive Ave., Guernsey Ave.
Drake Ave., Eleanor Ave., Cottage Ave., Summer Home Dr.
Jeane Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP3123 - SP3137
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
30' AC 0.17' A.C. <br /> Trans Overlay <br /> ° OL Const. <br /> � fi rt <br /> rn o o D r� <br /> < r <br /> z , zl <br /> C <br /> fTl C <br /> m � I Match Sheet 8 <br /> z / \ E.P. <br /> m ANTEROS AVENUE <br /> N Co <br /> 10 11 12 14 7 15 16 N <br /> D <br /> o Fr] ' <br /> i z <br /> E.P. <br /> m BEGINNING OF OVERLAY <br /> n D - <br /> N C <br /> (7 <br /> m vD 0.17 A.C. 50' A.C. <br /> rt y Trans. <br /> Overla <br /> m ro <br /> > Const. 25' <br /> M y I r�O sing 7l1s T?ra inq, Should Vpr'�r <br /> - <br /> 0 0 0 All in err?�n $ -u LEGEND <br /> 00De Depth of Asphalt <br /> 0.08 p Concrete Pavement Planing <br /> Ln <br /> Q ® Variable Depth Asphalt Concrete Overlay <br /> o /! Pavement Repair <br /> E.P. + + 0 +■ Limits of Asphalt Concrete Pavement Planing <br /> ANTEROS AVENUE _ '��� R Conform to Existing Radii <br /> N f —� _ _ �� / ® Maintenance Hole Frame and Cover <br /> ' (To be adjusted to grade). For locations 10 <br /> 6 n? 17 189 = see Sheet 14. <br /> / Water/Gas Valve Frame and Cover to be <br /> adjusted by others. <br /> ' / �� - <br /> E.P. �\ / n� O Exist. Storm Drain Inlet to remain in place. <br /> m END OF OF OVERLY <br /> zo <br /> EAST STOCKTON STREETS PHASE 6 Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE PLAN AND MANTECA AREA STR ETS RSURFACING <br /> (Anteros Avenue: Guernsey venue tO Bain Street) 4 of 15 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> Enrique Silva 03106 QR a 8 0 mxw /4ww <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.