Laserfiche WebLink
PAVEMENT REPAIR EARTHWORK (MISC. AREAS) PLACE MONUMENT FRAMES & COVERS <br /> Location Quantity Location Quantity Location Quantity <br /> 46 Locations (Throughout) 971 S.Y. Sta. 36+61 (3.5' Rt.) 1 Each <br /> Brandt Road <br /> Sta. 30+55 to Sta. 32+55 (Rt.) 2 Stations Sto. 63+18 (CL) 1 Eoch <br /> Total 2 Each <br /> PLANING ASPHALT CONCRETE PAVEMENT <br /> Location Quantity DRIVEWAYS <br /> Tretheway Road (South) Conform Type Number Area <br /> Sto. 2+03 to Sta. 2+28 39 S.Y. <br /> Trethewoy Rood (North) Conform Type D 13 Locations 280 S.Y. <br /> Sta. 5+33 to Sta. 5+48 23 S.Y. Type E 16 Locations 611 S.Y. <br /> Brandt Road (West of Locke) Conform <br /> Sta. 14+95 to Sto. 15+20 56 S.Y. Total 891 S.Y. <br /> Brandt Road (East of Locke) Conform <br /> Sta. 17+65 to Sto. 18+15 117 S.Y. <br /> D Brandt Road at SR 12 & 88 Conform <br /> o Sta. 65+78 to Sta. 66+28 317 S.Y. <br /> ASPHALT CONCRETE (TYPE A) <br /> M Total 552 S.Y. Location Quantity <br /> Z <br /> D <br /> M Tretheway Road <br /> Sta. 2+03 to Sta. 5+48 Mainline 43 Tons <br /> Brandt Road <br /> SHOULDER BACKING Sto. 10+00 to Sta. 15+20 Mainline <br /> Sto. 17+65 to Sta. 66+28 Mainline 1 ,990 Tons <br /> Location Quantity Pavement Repair 259 Tons <br /> Trethewoy Road Driveways 115 Tons _ <br /> Sta. 2+03 to Sta. 5+48 25 Tons Total 2407 Tons `` '° <br /> Brandt Road <br /> I N <br /> Sto. 10+00 to Sta. 15+20 Correction- <br /> Sta. 17+65 to Sta. 66+28No 662 Tons Cha►�r �� <br /> Date <br /> W D Total 687 Tons PAVEMENT REINFORCING FABRIC Anv t� sor loblog 'phis Drawing Should verify <br /> Location Quantity <br /> M <br /> A" �atormation By inspecting The Site of Worm <br /> Sta. 18+15 to Sta. 65+78 10,055 S.Y. <br /> M <br /> o Total 10,055 S.Y. <br /> COUNTY OF SAN JOA umma of Quantities Brandt Rd. Resurfacing Sheet No. <br /> UIN NO SCALE S <br /> Q rY (Tretheway Rd. to State Hwy. Route 12 & 88) 6 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL R COMMENDED DATE <br />