My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP3138 - SP3143
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP3138 - SP3143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:38:38 AM
Creation date
1/23/2016 12:58:01 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Brandt Road Resurfacing
Limits
Tretheway Road to State Highway Route 12 and 88
Year
2006
Project Engineer
Owen Davis
Roads Worked
Brandt Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP3138 - SP3143
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR EARTHWORK (MISC. AREAS) PLACE MONUMENT FRAMES & COVERS <br /> Location Quantity Location Quantity Location Quantity <br /> 46 Locations (Throughout) 971 S.Y. Sta. 36+61 (3.5' Rt.) 1 Each <br /> Brandt Road <br /> Sta. 30+55 to Sta. 32+55 (Rt.) 2 Stations Sto. 63+18 (CL) 1 Eoch <br /> Total 2 Each <br /> PLANING ASPHALT CONCRETE PAVEMENT <br /> Location Quantity DRIVEWAYS <br /> Tretheway Road (South) Conform Type Number Area <br /> Sto. 2+03 to Sta. 2+28 39 S.Y. <br /> Trethewoy Rood (North) Conform Type D 13 Locations 280 S.Y. <br /> Sta. 5+33 to Sta. 5+48 23 S.Y. Type E 16 Locations 611 S.Y. <br /> Brandt Road (West of Locke) Conform <br /> Sta. 14+95 to Sto. 15+20 56 S.Y. Total 891 S.Y. <br /> Brandt Road (East of Locke) Conform <br /> Sta. 17+65 to Sto. 18+15 117 S.Y. <br /> D Brandt Road at SR 12 & 88 Conform <br /> o Sta. 65+78 to Sta. 66+28 317 S.Y. <br /> ASPHALT CONCRETE (TYPE A) <br /> M Total 552 S.Y. Location Quantity <br /> Z <br /> D <br /> M Tretheway Road <br /> Sta. 2+03 to Sta. 5+48 Mainline 43 Tons <br /> Brandt Road <br /> SHOULDER BACKING Sto. 10+00 to Sta. 15+20 Mainline <br /> Sto. 17+65 to Sta. 66+28 Mainline 1 ,990 Tons <br /> Location Quantity Pavement Repair 259 Tons <br /> Trethewoy Road Driveways 115 Tons _ <br /> Sta. 2+03 to Sta. 5+48 25 Tons Total 2407 Tons `` '° <br /> Brandt Road <br /> I N <br /> Sto. 10+00 to Sta. 15+20 Correction- <br /> Sta. 17+65 to Sta. 66+28No 662 Tons Cha►�r �� <br /> Date <br /> W D Total 687 Tons PAVEMENT REINFORCING FABRIC Anv t� sor loblog 'phis Drawing Should verify <br /> Location Quantity <br /> M <br /> A" �atormation By inspecting The Site of Worm <br /> Sta. 18+15 to Sta. 65+78 10,055 S.Y. <br /> M <br /> o Total 10,055 S.Y. <br /> COUNTY OF SAN JOA umma of Quantities Brandt Rd. Resurfacing Sheet No. <br /> UIN NO SCALE S <br /> Q rY (Tretheway Rd. to State Hwy. Route 12 & 88) 6 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL R COMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.