My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4078 - SP4085
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4078 - SP4085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:51:27 AM
Creation date
1/23/2016 1:01:41 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Burkett Acres Resurfacing
Limits
Guernsey Avenue, Section Avenue, David Street, Netherton Avenue, Broadway Avenue and Garden Avenue
Year
2006
Project Engineer
Owen Davis
Roads Worked
Guernsey Ave., Section Ave., David St., Netherton Ave.
Broadway Ave., Garden Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP4078 - SP4085
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLEANING EXISTING DRAINAGE FACILITIES SHOULDER BACKING PAVEMENT REINFORCING FABRIC <br /> Location Quantity Location Quantity Location Quantity <br /> Guernsey Avenue Guernsey Avenue Guernsey Avenue <br /> Sto. 10+18t 1 Each Sto. 9+91 to Sta. 16+21 58 Tons Sto. 9+92 to Sta. 15+96 1,342 S.Y. <br /> Sta. 16+53 to Sta. 29+76 121 Tons Sto. 16+78 to Sto. 29+75 2,624 S.Y. <br /> Section Avenue Section Avenue <br /> PAVEMENT REPAIR Sto. 10+27 to Sta. 21 +36 115 Tons Sto. 10+52 to Sta. 21 +35 2,433 S.Y. <br /> Locat►onQuantity David Street <br /> Sto. 5+11 to Sto. 8+73 29 Tons Total 6,399 S.Y. <br /> 4014rLocotions (Throughout) S.Y. Netherton Avenue <br /> 1 3! Sta. 5+10 to Sta. 8+90 31 Tons <br /> Broadway Avenue <br /> PLANING ASPHALT CONCRETE PAVEMENT Sto. 5+10 to Sta. 8+12 • 24 Tons <br /> Gorden Avenue <br /> Location Quantity Sto. 5+10 to Sto. 7+43 19 Tons <br /> Guernsey Avenue Total 397 Tons <br /> Sto. 15+96 to Sto. 16+21 79 S.Y. <br /> Sto. 16+53 to Sta. 16+78 79 S.Y. DRIVEWAYS <br /> Section Avenue <br /> Sto. 10+27 to Sto. 10+52 333 S.Y. Type Number Area <br /> D <br /> 0 Total 491 S.Y. Type D 38 Locations 368 S.Y. <br /> m Type E 49 Locations 575 S.Y. <br /> z <br /> D <br /> m Total 943 S.Y. <br /> ADJUST SANITARY MAINTENANCE <br /> HOLE FRAMES & COVERS ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity <br /> ( � Netherton Avenue David Street 82 Tons <br /> �+l Sto. 8+30 (5' Lt.) 1 Each Netherton Avenue 96 Tons <br /> Gorden Avenue Broadway Avenue 76 Tons <br /> Sto. 6+92 (4' Lt.) 1 Each Garden Avenue 53 Tons <br /> Guernsey Avenue Guernsey Avenue <br /> O N Sto. 22+29 (3' Rt.) 1 Each Sta. 9+91 to Sto. 16+21 213 Tons <br /> v Sto. 25+39 (3' Rt.) 1 Each , <br /> Sto. 16+53 to Sto. 29+76 421 Tons '"" m �'` <br /> Sto. 28+38 (3' Rt.) 1 Each _ K <br /> > Section Avenue 577 Tons , ,, V <br /> m Total 5 Each <br /> Pavement Repair 516 Tons ,: o <br /> Driveways 123 Tons ,� <br /> rn <br /> Zaip479 I� tr13 <br /> Total 2,157 Tons � <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES BURKETT ACRES RESURFACING Sheet No. <br /> (Six Streets — See Title Sheet) 8 of 8 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE f APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.