Laserfiche WebLink
Z <br /> 0.17' A.C. _ <br /> Overlay <br /> 0 0 <br /> N ® Place ADA Ramp <br /> N o N ° for details <br /> rn -,j See Sheets 16 & 17 <br /> 00 Const. <br /> S <br /> --1 Ln J C71 <br /> N <br /> S <br /> Sta. 07+00 on Capistrano Avenue N D Sta. 10+46 on Capistrano Avenue cn c, <br /> = Sta. 26+58 on Paloma Avenue 0-)10 = Sta. 07+30 on Barcelona Avenue <br /> o <br /> D <br /> nD 11 � <br /> D <br /> 13 <br /> n <br /> 0 <br /> CAPISTRANO AVENUE - r • <br /> • C) : <br /> ° m . . . . . . . . . fTl :. <br /> 2 Z <br /> Cf) U <br /> D m 8 9 10 <br /> s _ D <br /> v • <br /> Existing Curb & Gutter N D Existing Curb Gutter 12•� M <br /> to remain in place (Typ.) < g Decorative Rock to be <br /> z and <br /> SidewalkP to remain removed & replaced C <br /> in lace T after concrete work. <br /> C Work to be paid under <br /> Clearing and Grubbing. Co <br /> END OF OVERLAY <br /> � o <br /> �D <br /> M <br /> r <br /> M <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUINNO SCALE PLAN COLONIAL HEIGHTS RESURFACING PHASE 1 Sheet No. <br /> (Capistrano Avenue: EI Camino Avenue to Barcelona Avenue) 13 of 20 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CUkCKED DATE I APPROVAL RECOMMENDED DATE <br /> Enrique Sifva 06/06 �,,(� G19 <br /> if <br />