LEVELING SCHEDULE ST. JOHN AVENUE) <br /> Const. Station "X" Station "X" Station "X" Station "X" Station "X" <br /> Limits of Clearing and Grubbing 0+75 0.19' 14+00 0.28' 25+00 0.32' 34+00 0.12' 46+75 0.29' <br /> 2+00 0.38' 15+00 0.39' 26+00 0.16' 36+00 0.30' 48+00 0.16' <br /> See -- $' See 4+00 0.28' 16+00 0.41' 26+65 0.20' 37+50 0.16' 49+00 0.28' <br /> Shoulder Shoulder 5+00 0.31' 16+82 0.53' 27+00 0.33' 38+00 0.13' 50+00 0.36' <br /> Details _1.5� 3.0�_ Detoils <br /> Below - Below 6+00 0.40' 17+10 0.40' 28+00 0.32' 39+00 0.26' 50+85 0.10' <br /> 7+00 1.02' 18+00 0.26' 29+00 0.50' 39+50 0_.32' 52+00 0.29' <br /> 0.12' Asphalt Concrete Overlay 8+00 0.16' 19+00 0.35' 30+00 0.28' 40+00 0.33' 53+13 0.25' <br /> Variable Depth Exist. Roadwayp y <br /> 9+00 0.27' 19+22 0.25' 31+00 0.24' 41+50 0.29' 55+00 0.19' <br /> A.C. Leveling TYPICAL SECTION 10+00 0.23' 20+15 0.22' 32+00 0.20' 42+00 0.31' 57+00 0.18' <br /> Sta. 0+34 to Sta. 57+07 -� %� 12+00 0.34' 22+00 0.20' 32+80 0.31' 44+00 0.17' <br /> a 13+20 10.33' 24+00 0.26' 33+00 0.17' 45+90 0.12' <br /> Note: "X" is the thickness of the A.C. leveling at the q-Const. <br /> GENERAL NOTES: <br /> Const. Const. 1 . Contractor shall scarify native soil adjacent to pavement <br /> Limits of Clearing and Grubbing Limits of Clearing and Grubbing at intersection radii to a depth of 6" and blend shoulder <br /> backing material prior to compaction. Limits of this work <br /> 2' 2'_ 10'} 1' 4' 10't r% shall be confined to intersection radii plus 50 feet in each <br /> direction. Payment for blending shall be considered as <br /> 0.5' <br /> Conform 1 ' included in the price for Shoulder Backing. <br /> 8% Var 2. Existing drainage focalities shall remain in place unless <br /> Conform "101 <br /> _ - <br /> otherwise noted. The Contractor shall conduct earthwork <br /> /" operations as not to modify or obstruct the existing drainage. <br /> Variable Depth L _ _ _ <br /> - - L - - - - - Shoulder Backing 3. All earthwork (except for final shoulder grading) shall be <br /> 8 Local and p,17' Shoulder Backing completed prior to placing final lift of asphalt concrete. <br /> Imported Borrow SHOULDER DETAIL 2p Y <br /> 4. Placement of asphalt concrete overlay shall not begin until <br /> SHOULDER DETAIL 1 the asphalt concrete used in pavement leveling has been <br /> D in place for 18 hours. <br /> � D <br /> D o 5. Asphalt Concrete shall be placed as noted below: <br /> SHOULDER SCHEDULE 0.12' Thickness <br /> One (1 ) layer over variable depth A.C. leveling. <br /> z <br /> ST. JOHN AVENUE 6. All existing trees, schrubs, fences and other frontage <br /> improvements ore to remain in place unless otherwise noted. <br /> s t. LEFT <br /> Cons <br /> 7. All native, including Earthwork areas, that will receive A.C. <br /> Limits of Clearing and Grubbing Station to Station Detoil Station to Station Detoil leveling shall be compacted to a relative compoction of not <br /> N i 0+09 to 8+00 1 0+09 to 11+75 1 less than 95% prior to the commencement of paving operations. <br /> Earthwork (Misc. Areas) 8+00 to 13+30 2 11+75 to 17+00 3 8. Payment shall be considered as included in the paces paid <br /> I 13+30 to 18+50 1 17+00 to 20+00 1 for the various items of work involved and no additional <br /> 10, 3' 3' 118+50 to 20+00 2 20+00 to 26+50 3 compensation will be allowed therefor. <br /> 20+00 to 23+00 3 26+50 to 38+00 2 g, 2' Top Soil shall be used in place of Shoulder Backing at <br /> 87. _ vow_ _ _ 23+00 to 25+50 2 38+00 to 39+30 1 the following locations on St. John Avenue: <br /> 25+50 to 36+00 1 39+30 to 40+90 2 Sto. 9+00 to Sta. 10+75 (Lt.) Sto. 51 +10 to Sto. 51 +50 (Lt.) <br /> 410111 Ln I Conform 36+00 to 39+30 2 40+90 to 45+90 1 Sta. 37+40 to Sto. 38+40 (Rt.) Sto. 52+00 to Sto. 52+50 (Rt.) <br /> J 39+30 to 41+30 1 45+90 to 57+07 3 Sta. 46+45 to Sto. 47+20 (Rt.) <br /> Variable Depth 41+30 to 48+60 2 <br /> Shoulder Backing 48+60 to 51+10 1 Where Top Soil is required it shall conform to the requirements <br /> M SHOULDER DETAIL 3 51+10 to 53+10 2 <br /> of Section 20-2.01 "Top Soil" of the Standard Specifications, <br /> � 53+10 to 56+40 3 see Special Provision 19S. <br /> 56+40 to 57+07 2 10. Excavated Material generated under Earthwork (Misc. Areas) <br /> il r- shall be used as local borrow. <br /> M <br /> TYPICAL SECTIONS ST. JOHN AVENUE RESURFACING Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE AND GENERAL NOTES (Jones Avenue to Countrywood Lane) 2 of 5 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CH ED DATE APPROVAL RECOMMENDED DATE <br />