Laserfiche WebLink
CLEANING EXISTING DRIVEWAYS 18" DIAMETER CORRUGATED <br /> DRAINAGE FACILITY Quantity STEEL PIPE <br /> Location Quantity Type No. Area Location Quantity <br /> Sta. 25+50t 1 EACH Driveways Type "D" 12 121 S.Y. Intersections <br /> Sta. 26+10± 1 EACHCherokee Lane 100 L.F. <br /> Driveways Type "E" 32 589 S.Y. <br /> Sta. 27+60f 1 EACH Dustin Rood 130 L.F. <br /> Sta. 42+15t 1 EACH Total 230 L.F. <br /> Sta. 52+60f 1 EACH <br /> Sta. 104+50t 1 EACH <br /> Sta. 126+15f 1 EACH 24" DIAMETER STORM <br /> Sta. 131 +60f 1 EACH <br /> Total 8 EACH ASPHALT CONCRETE (TYPE B) DRAIN INLET <br /> Location Quantity Location Quantity <br /> PAVEMENT REPAIR Mainline 2,856 Tons Intersections <br /> Driveways 142 Tons Cherokee Lane 2 EACH <br /> Location QuantityDustin Road 3 EACH <br /> Pavement Repair 1,1 17 Tons <br /> Total 5 EACH <br /> D 47 Locations 4,188 S.Y. Total 4.115 Tons <br /> D <br /> F <br /> M PLANING ASPHALT 24" FRAME & COVER <br /> K <br /> M CONCRETE PAVEMENT ASPHALT CONCRETE Location Quantity <br /> Location Quantity (TYPE B) LEVELING Intersections <br /> Cherokee Lane 2 EACH <br /> Intersections Location Quantity Dustin Road 3 EACH <br /> HW 99 Frontage Road 61 S.Y. Sto. 10+70 to Sta. 132+75 1,868 Tons Total 5 EACH <br /> Cherokee Lane 122 S.Y. <br /> Kennefick Road 122 S.Y. �- ��-������ ��IPLACE SURVEY MONUMENT <br /> Z Dustin Rood 183 S.Y. <br /> Total 488 S.Y. <br /> FRAME AND COVER <br /> N <br /> PAVEMENT REINFORCING FABRIC Location Quantity <br /> Sta. 25+15± 1 EACH <br /> Location Quantity Sta. 78+45t 1 EACH <br /> m SHOULDER BACKING y <br /> Sta. 131 +83t 1 EACH <br /> Location Quantity Sta. 10+70 to Sta. 132+75 26,567 S.Y. Total 3 EACH <br /> r <br /> m <br /> z <br /> o Sta. 10+70 to Sta. 132+75 445 Tons <br /> COUNTY OF SAN JOAQUINSUMMARY OF QUANTITIES COLLIER ROAD RESURFACING Sheet No. <br /> (North 99 Frontage Road East to Dustin Rood) 7 of 7 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE CHEC D DATE APPROVAL RECOMMENDED DATE <br /> T R. Caf&han 1/07 ..,i�co �� yA 1 <br />