My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4248 - SP4261
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4248 - SP4261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 11:02:46 AM
Creation date
1/23/2016 1:06:32 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Bear Creek Terrace (West)/Hillside Drive Resurfacing
Limits
Bear Creek Terrace (West): Coquille Drive, Coquille Court, Juniper Avenue, Lockwood Lane, Oak Knoll Avenue, Parkdale Drive, and Prospect Place Hillside Drive: Victor Road to Brandt Road
Year
2007
Project Engineer
T. Sessoms
Roads Worked
Coquille Dr., Coquille Ct., Juniper Ave., Lockewood Ln.
Oak Knoll Ave., Parkdale Dr., Prospect Pl., Hillside Dr.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP4248 - SP4261
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br /> 1 . Placement of Asphalt Concrete surfacing shall not begin CCV751 <br /> until the Asphalt Concrete used in pavement repair has Limits of <br /> been in place for 18 hours. Clearing & (Grubbing <br /> 2. Asphalt Concrete 0.17' shall be placed in One (1) layer with <br /> Pavement Reinforcing Fabric on existing or prepared surface. 4' 3' 15'-20' 15-20' 3' 4' <br /> Asphalt Concrete 0.20' shall be placed in Two (2) layers with <br /> See * See <br /> Pavement Reinforcing Fabric on existing or prepared surface. Shoulder 18'-28' Pavement Reinforcing FabricDetail over Variable Depth Leveling Course Detail <br /> Shoulder <br /> 3. Hand Grinding of Asphalt Concrete Pavement will be required Sheet 11 Sheet 11 <br /> at locations where monuments and maintenance holes _1.s� i_s�_ <br /> are within planing limits. `v= Vag_ <br /> 4. Install Expansion Joints at beginning and end of new <br /> Curb, Gutter and Sidewalk. Existing Roadway_ <br /> ---- -------- ------- --------� <br /> 5. All new Curb, Gutter and Sidewalk shall conform to the 0.04' AC 0.17' AC Existing Curb, <br /> existing flowline elevations, with a straight grade between Leveling Course (Typ) 0.12' ACOverlay Gutter and Sidewalk <br /> conforms. <br /> Leveling Course (Typ) to remain in place (Typ) <br /> 6. Street side Storm Drain Inlets shall be protected from liquid TYPICAL SECTION <br /> runoff sediments and chemical pollutant in a manner consistent Coquille Drive: (Sto 10+20 to Sta 23+05) 20' <br /> with the requirements of the National Pollution Discharge Elimination Coquille Court: (Sto 10+16 to Sta 12+53) 20' <br /> System (NPDES) General Construction Permit and per Special Provisions. Juniper Avenue: (Sta 10+06 to Sta 17+80) 28' <br /> 7. Existing drainage facilities, fences, frames and covers, Lockewood Lane: (Sto 10+20 to Sta 24+40) 20' <br /> sprinkler heads, trees, shrubs and curb, gutter and sidewalk shall Oak Knoll Avenue: (Sta 08+65 to Sto 09+80) 18' <br /> o remain in place unless otherwise noted on the plans. (Sta 09+80 to Sto 22+07) 28' <br /> -`18. Asphalt Concrete (Miscellaneous Areas) shall be placed in two Parkdale Drive: (Sta 10+06 to Sta 22+99) 28' <br /> M lifts. (See Sheet 12 for AC Miscellaneous Areas Detail) The cost of Prospect Place: (Sta 10+31 to Sta 22+87) 20' <br /> D Asphalt Concrete (Miscellaneous Areas) shall be included in f�' <br /> M the Minor Concrete (Curb, Gutter and Sidewalk) item of work. <br /> CO/7St <br /> 9. All Minor Concrete (Curb, Gutter and Sidewalk) that is to Limitsl of <br /> be removed shall be saw cut to the limits shown on the Clearing & ,Grubbing <br /> plans. The cost of the saw cutting shall be included in the <br /> Minor Concrete (Curb, Gutter and Sidewalk) item of work. <br /> "Sidewalk only" replacement to be paid under Minor4' 16' 16' 4' <br /> Concrete (Curb, Gutter and Sidewalk) item of work. n n <br /> 0 0 <br /> 10. Reference to Class "B" concrete in these Plans or Special Provisions o 30' Pavement Reinforcing Fabric D <br /> 0 <br /> shall be interpreted to mean Class 3 Concrete. 3 I % <br /> 1 <br /> yar_ va_ r� <br /> N <br /> —7-`' Existing Roadway —1— <br /> D <br /> `_ <br /> M <br /> Shoulder Backing (Typ) 0.20' AC <br /> M <br /> TYPICAL SECTION <br /> z Hillside Drive: (Sta 11 +85 to Sto 42+81) <br /> 0 <br /> COUNTY OF SAN JOAQUINNO SCALE TYPICAL SECTIONS BEAR CREEK TERRACE (WEST)/HILLSIDE DRIVE RESURFACING Sheet No. <br /> (Various Roads) 2 of 14 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHE KED DATE APPROVAL RECOMMENDED DATE <br /> - —. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.