Laserfiche WebLink
GENERAL NOTES <br /> 1 . Placement of asphalt concrete shall not begin until the asphalt concrete used in <br /> t Pavement Repair has been in place for 18 hours. <br /> am <br /> I 2. Asphalt Concrete shall be placed as follows: <br /> Limits of Clearing and Grubbing — 0.21' Overlay: (2) Two layers of approximately equal thickness with <br /> reinforcing fabric laced on the existing pavement or prepared surface. <br /> and Mailbox Relocation. — 0.17' Overlay: 1) One layer with reinforcing fabric placed on existing <br /> 1' 4 12'— -- - 12' 4 1' pavement or prepared surface. <br /> See Shoulder 22' Pavement Reinforcing Fabric See Shoulder 3. Hand Grinding of Asphalt Concrete Pavement will be required at locations where <br /> Details I Details water/gas valves and maintenance holes ore within ploning limits. <br /> Conform Conform 4. Frame and Cover for maintenance holes to be adjusted to Finish Grade Refer <br /> var. va _ var to Improvement Std. No. CW—R36 for details. <br /> 5. Woter/gos valve fromes and covers to be adjusted by others after completion <br /> L---------- - ---- -------- ------------ - of project. <br /> Shoulder Existing Roadway 6. <br /> Backing T 0.17-0.21' A.C. Overlay Shoulder Rocking material at all radii shall be blended with the top 6" of <br /> g ( yp.) native material as directed by the Engineer. Limits of work shall be <br /> a TYPICAL SECTION (STREETS NORTH OF MAIN ST.) confined to intersection rodii plus 50 feet each direction. Payment for blending <br /> ni shall be considered as included in the unit price paid for Shoulder Backing. <br /> Gertrude Avenue: Sto. 0+26 to Sto. 32+60 0.21' <br /> 0 Gertrude Avenue: Sto. 32+92 to Sto. 44+99 0.17' 7. The Contractor shall conduct the Shoulder Backing operation so as not distrub <br /> D or obstruct an existing drainage. <br /> i Sinclair Avenue (N): Sto. 0+26 to Sta. 32+60 0.21' y g g <br /> 0 o Sinclair Avenue (N): Sta. 32+92 to Sto. 45+50 0.17' 8. Port Circle Culverts and Steel Plating at driveways ore to remain in place unless <br /> o -n Myrtle Street: Sto. 10+50 to Sto. 17+50 0.17' directed otherwise in the plans. <br /> rt m Coolidge Avenue: Sto. 32+92 to Sto. 40+10 0.17' <br /> Carroll Avenue: Sto. 32+92 to Sto. 40+10 0.17' 9. Street side Storm Drains inlets will be protected from liquid runoff sediments and <br /> `� 2 chemicals pollutant in a monner consistent with the requirements of The Notional <br /> Dawes Avenue: Sta. 32+92 to S + �, , P q <br /> c �*, REUa N G <br /> Pollution Discharge Elimination System (NPDES) General Construction Permit. <br /> 10. Contractor is to notify the City of Stockton Municipal Utilities Deportment at <br /> N Corrections Py (209) 937-8750 48—hours in advance of adjusting the Sanitary Sewer <br /> M No Chun �. 5 , ' '� �— Maintenance Holes to finish grade. <br /> o Date' 9 /�$�� 1. All eorthwork except final lift of Shoulder Backing shall be completed prior to <br /> " � Any Peron ;i�g his c d'r'r1 Should Verify placing the Asphalt Concrete Resurfacing. No shoulder backing material shall be <br /> CwsConst. 2Ctin The Site Of Work deposited or drifted onto the Asphalt Concrete Resurfacing. <br /> A110MQ iQM�W 9 12. Reference to Class "B" concrete in these Plans or Special Provisions shall be <br /> Limits of Clearing i� and Grubbing interpreted to mean Class 3 concrete. <br /> I and Grubbing , <br /> 2'-4' 13. All minor Concrete (Curb and Gutter) that is to be removed shall be sow cut to <br /> "' ( ;�--✓� 12' 2' the limits shown on the plans. The cost of the sow cutting and removal is to be <br /> 12' 2'-4' Earthwork Misc. Area included in the Minor Concrete (Curb and Gutter) item of work. <br /> 14. Frame and Cover for maintenance holes to be adjusted to Finished Grade. Refer <br /> —Vor.� Conform ' to S.J. Co. Impromement Std. No. CW—R36 for details. Sanitary Sewer Maintenance <br /> Vim` Var._ Conform Holes Frame and Cover shall be adjusted to grade per City of Stockton Stondards. <br /> — v\71B <br /> Refer to Improvement Standards Drawing No. 54 & 55. <br /> cn IExisting Roadway <br /> — — — — — — — I Existin Roodwo 15. All new Curb and Gutter or Curb, Gutter and Sidewalk shall conform to the <br /> v — 9— — — y ' existing flowline elevations, with a straight grade between conforms. <br /> Shoulder Backing lder <br /> king 16. Asphalt Concrete (Miscellaneous Areas) shall be placed in two lifts. <br /> SHOULDER DETAIL 1 0.35 A.C. Widening 17. Removal of A.C. dike where shown on the plans shall be done in such a <br /> m (A.C. Miscellaneous Areas) <br /> M Sinclair Avenue (N): manner as not to damage surface beneath dike. Payment for dike removal and <br /> Sto. 15+20t to Sto. 45+50 (Lt. & Rt.) SHOULDER DETAIL 2 disposal shall be considered as included in the contract Lump Sum unit price for <br /> rn <br /> z Coolidge Avenue Sinclair Avenue (N): Clearing and Grubbing. <br /> Sto. 32+92t to Sto. 40+10 (Lt. & Rt.) Sto. 44+75t to 45+50t (Rt.) 18. Contractor shall obtain a no fee encroachment permit from the City of Stockton <br /> Public Works Deportment before performing any work on the Sanitary Sewer System. <br /> COUNTY OF SAN JOA UIN TYPICAL SECTION EAST STOCKTON STREETS RESURFACING PHASE 7 Sheet No. <br /> Q NO SCALE AND GENERAL NOTES (Streets North of East Main Street) 2 of 17 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> Enrique Siva 02/07 -Z�4 /6;c: i UA 21d Y z�o7A <br /> .0&1/ =` P. <br /> 0 <br />