Laserfiche WebLink
PLANING ASPHALT CONCRETE DRIVEWAYS (TYPE D) ASPHALT CONCRETE <br /> PAVEMENT Location Quantity (TYPE B) LEVELING <br /> Location Quantity Gawne Road Location * Quantity <br /> Gawne Road <br /> to. 00+12 to Sta. 00+37 174 S.Y. 7 Locations 102 S.Y. Gawne Road <br /> to. 159+45 to Sta. 159+70 174 S.Y. Sta. 0+62 to Sta. 159+20 2,068 Tons <br /> Total 102 S.Y. <br /> Mobley Road * A.C. Leveling will occur Total 2,068 Each <br /> Sto. 10+12 to Sta. 10+37 140 S.Y. through out the project <br /> Total 488 S.Y. DRIVEWAYS (TYPE E) <br /> Location Quantity PAVEMENT REINFORCING FABRIC <br /> Gawne Road Location Quantity <br /> ^' 2 Locations 34 S.Y. Gawne Road <br /> ADJUST MONUMENT <br /> FRAME AND COVER Sto. 00+62 to Sta. 159+20 38,764 S.Y. <br /> D Location Quantity Total 34 S.Y. <br /> o Total 38,764 S.Y. <br /> Gawne Road <br /> (D' ; Sto. 26+59 (Center) 1 Each <br /> a z Sta. 53+18 (Center) 1 Each <br /> I K Sta. 80+23 (Center) 1 Each ASPHALT CONCRETE (TYPE B) PLACE MONUMENT <br /> Location Quantity FRAME AND COVER <br /> a Gawne Road <br /> Total 3 Each Location Quantity <br /> Resurfacing 5,696 Tons <br /> Gawne Road <br /> Driveways (Type D) 20 Tons Sto. 106+77 (Center) 1 Each <br /> Driveways (Type E) 3 Tons Sta. 134+11 (Center) 1 Each <br /> Intersection 24 Tons <br /> SHOULDER BACKING <br /> Location Quantity <br /> Total 2 Each <br /> Total 5,743 Tons <br /> Gawne Road <br /> Left Side 1,364 Tons <br /> o Right Side 1,470 Tons <br /> RECORD D <br /> 834 Tons <br /> Total 2. Corrections sy <br /> No Changes By <br /> Date 0 0 11 <br /> Any person Using This Drawing Should Verify <br /> All information By inspecting The Site Of Work <br /> M <br /> rn <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANITITES GAWNE ROAD RESURFACING PROJECT Sheet Ni <br /> (VAN ALLEN ROAD TO ESCALON—BELLOTA ROAD) 6 of 6 <br /> DRAWN BY DATE XROJECT ENGINEER DATE CHECKED DATE2 APPROVALRECOMMENDEDDATE <br /> G. Xiong 4/2/07 <br />