My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4299 - SP4306
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4299 - SP4306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:00:16 AM
Creation date
1/23/2016 1:08:05 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Howard Road Resurfacing
Limits
Middle River to Roberts Road
Year
2007
Project Engineer
Kaila Cassal
Roads Worked
Howard Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4299 - SP4306
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const Const. <br /> Limits of Clearing and Grubbing - f Limits of Clearing and Grubbing <br /> 4' 12' no I • 12' 4' See 12' ► I 12' 4' <br /> Shoulder I Shoulder Shoulder I Shoulder <br /> Details 28 Pavement Reinforcing Fabric Details Details 28 Pavement Reinforcing Fabric Details <br /> I I <br /> IV 3-r- _ 2% 2%- VC r.- _Var. <br /> -2% 2% Var.- <br /> 14L-=l 1Z 1A <br /> Existing Roadway Existing Roadway 1 0.17' <br /> 0.17'_j ------- --------- -----------I 0.17 0.17 --L ------------------ ----i I <br /> 0.25' AC overlay TYPICAL SECTION <br /> TYPICAL SECTION, 0.25' AC overlay <br /> Sto. 269+83 to Sta. 283+80 (Super-Elevation) <br /> Sto. 292+53 to Sto. 384+50 Sto. 283+80 to Sta. 292+53 <br /> 0 <br /> rn <br /> GENERAL NOTES: <br /> N <br /> N 1. Placement of asphalt concrete shall not begin until the asphalt <br /> o > concrete used in Pavement Repair has been in place for 18 hours. <br /> v 2. Asphalt Concrete shall be placed in (2) Two layers of <br /> Fapproximately equal thickness with pavement reinforcing fabric <br /> X <br /> Z CO/!St. CD/7St placed on the existing pavement or prepared surface. <br /> o Limits of Limits of � 3. The Contractor shall conduct the Shoulder Backing operation so <br /> A Clearing and Grubbing � Clearing and Grubbing as not to disturb or obstruct any existing drainage. <br /> WI 1 2. I 4. Shoulder Backing material at oil rodii shall be blended with the <br /> 4' 12 �� 4'- 4' 12' top 6" of native material as directed by the Engineer. <br /> vi Limits of this work shall be confined to the intersection rodii plus <br /> I 8% _Var._ <br /> -2% 50' each direction. Payment for blending shall be considered as <br /> -Var. -2% Conform fat. `� ( included in the unit price paid for Shoulder Backing. <br /> r.- <br /> __ -„ s _ _ _ _ _ 5. Removal of A.C. Dikes where shown on the plans shall be done in <br /> such manner as not to damage surface beneath dike. <br /> Shoulder Backing - Existing 6. Remove and Dispose Asphalt Concrete Overside Drains. Shall be <br /> R.&D. Exist. Dike Existing Roadway considered as included in the Remove Asphalt Concrete Dike <br /> Place A.C. Dike (Type A) Roadway item of work. Placement of Overside Drains to be considered <br /> SHOULDER DETAIL 2 as included in the prices paid in the various items of work. <br /> o <br /> SHOULDER DETAIL 1 7. Where Superelevotion exist on horizontal curves, <br /> Sto. 269+83t to Sta. 278+60t (Lt. & Rt.) Sto. 278+60f to Sto. 384+50t (Lt. & Rt.) surface slope and drainage shall conform with the existing. <br /> 171M <br /> ZO <br /> COUNTY OF SAN JOAQUIN NO SCALE PI AL SECTION HOWARD ROAD RESURFACING Sheet No. <br /> (Middle River to Roberts Road) 2 of 8 <br /> DRAWN BY DATE I PROJECT ENGINEER DATE CHECKEQ DATE APPROVAL RECOMMENDED DATE <br /> Enrique Sifva 03/07 ,u&f �ei� 1214 <br /> X&0VWdD 0 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.