My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4299 - SP4306
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4299 - SP4306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:00:16 AM
Creation date
1/23/2016 1:08:05 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Howard Road Resurfacing
Limits
Middle River to Roberts Road
Year
2007
Project Engineer
Kaila Cassal
Roads Worked
Howard Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4299 - SP4306
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR EARTHWORK DRIVEWAYS <br /> Location Quantity MISCELLANEOUS AREAS Quantity <br /> 13 Locations 222 S.Y. (SHOULDER EROSION) Type No. Area <br /> Driveways Type "D" 1 89 S.Y. <br /> Location Quantity <br /> Driveways Type "E" 6 111 S.Y. <br /> Sto. 337+85 f (27' Lt.) 16' x 6' .16 Sto. <br /> Sto. 338+80 t (27' Lt.) 12' x 5' .12 Sto. <br /> Sto. 339+80 f (27' Lt.) 12' x 7' .12 Sto. ASPHALT CONCRETE (TYPE A) <br /> REMOVE AC DIKE Sto. 341 +15 t (27' Lt.) 7' x 3' .07 Sto. <br /> Sto. 345+70 t (27' Lt.) 15' x 5' .15 Sto. Location Quantity <br /> Location Quantity Sto. 345+90 t (27' Lt.) 23' x 5' .23 Sto. <br /> Sto. 347+60 t (27' Lt.) 21 ' x 4' .21 Sta. Moinline & Intersections 6,458 Tons <br /> Sto. 270+80 to 278+50 (Rt.) 800 L.F. Sto. 349+50 t (27' Lt.) 7' x 4' .07 Sto. A.C. Dike (Type A) 43 Tons <br /> i Sto. 270+80 to 278+50 (Lt.) 825 L.F. Sta. 350+25 f (27' Lt.) 6' x 4' .06 Sto. Drivewoys 29 Tons <br /> Sto. 352+00 t (27' Lt.) 15' x 4' .15 Sta. pavement Repair 74 Tons <br /> Total 1625 LF. <br /> R, Sto. 353+10 f (27' Lt.) 4' x 4' .04 Sto. <br /> N Sta. 367+30 t (27' Lt.) 5' x 6' .05 Sta. Total 6.604 Tons <br /> Sto. 368+00 t (27' Lt.) 3' x 6' .03 Sta. <br /> o <br /> o > Sto. 368+15 t (27' Lt.) 3' x 5' .03 Sta. <br /> Sto. 379+16 t (23' Lt.) 27' x 5' .27 sta. PLACE AC DIKE (TYPE A) <br /> _ ; Sta. 380+14 t (23' Lt.) 32' x 6' .32 Sto. <br /> 01 <br /> > PLANING ASPHALT sta. 375+sot (23' Lt.) 500' x 5' S.00 Sta. Location Quantity <br /> OL-11 <br /> M Total 7.08 Sta. <br /> 0 <br /> CONCRETE PAVEMENT Sto. 270+80 to 278+50 (Rt.) 825 L.F. <br /> N Location Quantity Sto. 270+80 to 278+50 (Lt.) 800 L.F. <br /> C <br /> 3 Sta. 269+83 to Sta. 270+03 89 S.Y. Total 1625 LF. <br /> o Sta. 288+14 to Sta. 288+89 267 S.Y. SHOULDER BACKING <br /> Sta. 295+95 to Sto. 296+70 267 S.Y. <br /> Sta. 383+00 to Sta. 383+50 178 S.Y. Location Quantity PAVEMENT REINFORCING FABRIC <br /> Stark Rood Intersection 106 S.Y. Sto. 278+50 to Sto. 383+50 1969 Tons <br /> Location Quantity <br /> Crocker Rood Intersection 133 S.Y. <br /> y, Borba Rood Intersection 66 S.Y. Sto. 271+13 to Sto. 287+64 5,136 S.Y. <br /> Sto. 289+39 to Sto. 295+45 1,885 S.Y. <br /> M Total 1106 S.Y. Sto. 297+20 to Sto. 382+50 26,538 S.Y. <br /> A <br /> Total 33.559 S.Y. <br /> rn <br /> Z _ 71 _ - <br /> COUNTY OF SAN JOAQUIN No SCALE 4SMMARY OF HOWARD ROAD RESURFACING Sheet No. <br /> QUANTITIES (Middle River to Roberts Rood) 8 of 8 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATEI APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.