My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4380 - SP4386
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4380 - SP4386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:05:21 AM
Creation date
1/23/2016 1:09:59 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Archerdale Road Resurfacing
Limits
State Highway Route 26 to Baker Road
Year
2007
Project Engineer
Bernard Raiz
Roads Worked
Archerdale Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4380 - SP4386
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br /> Const.s 1. All eorthwork (except for final shoulder grading shall be completed <br /> prior to placing final lift of asphalt concrete. No Shoulder Backing <br /> Limits of Clearing and Grubbing, and Mailbox Relocation shall be deposited or drifted on the final lift of asphalt concrete <br /> 10' 1 10' surfacing. Where the Shoulder Backing placement exceeds 0.30' <br /> See 1 See in thickness, the Shoulder Backing shall be placed in two fully <br /> Shoulder 18' Pavement Reinforcing Fabric Shoulder compacted layers. <br /> Details I Details 2. Asphalt Concrete shall be placed in one (1) layer with pavement <br /> this Sheet 0.17' A.C. Overlay this Sheet reinforcing fabric placed over existing pavement. <br /> Var. I Vo r. 3. Existing drainage facilities shall remain in place unless otherwise <br /> If! <br /> noted. The Contractor shall conduct earthwork operations so as <br /> �J not to modify or obstruct the existing drainage. <br /> L _ _ _ _ — _ _ _ _ _ _ _ 4. All existing trees, shrubs, fences and other frontage improvements <br /> c ,me are to remain in place unless otherwise noted. <br /> t N <br /> TYPICAL SECTION Existing Roadway i 5. Placement of asphalt concrete overlay shall not begin until the <br /> asphalt concrete used in pavement repair has been in place for <br /> Const. Sta. 0+12 to Sta. 58+01 12 hours. <br /> Limits of Clearing and Grubbing a 6. Shoulder Backing Material at all intersection radii shall receive <br /> I and Mailbox Relocotion 0 z c penetration treatment at 0.25 gallon/square yord. Limits of the <br /> penetration treatment work shall be confined to the intersection <br /> 10' 4' <br /> a: s 5 m radii plus fifty feet (50') in each direction or to the intersection <br /> 1 E conform. <br /> N L a d 1 <br /> g ( Var Exist. U 2 c a 7. Contractor will be required to obtain encroachment permits and <br /> CD <br /> o ground s c enter into on agreement with Coltrons and ST&ERR for work <br /> A within the States and Railroad's jurisdiction, respectively. <br /> Const. u 2 0 <br /> CL ( — Var. Depth <br /> 8 i Shoulder Backing <br /> m Existing RoadwayI Limits of Clearing and Grubbing <br /> TAI and Mailbox Relocation <br /> Const. <br /> * Provide Topsoil per Section 20-2 of the Standard Spec 10' 4' 4' Limits of Clearing and Grubbing <br /> H at the following landscaped frontages p AV <br /> and Mailbox Relocation <br /> 2' Sta. 8+50 to 8+80 (Lt.) & Sto. 17+85 to 18+45 (Lt.) I <br /> 1' Sto. 27+20 to 29+90 (Rt.) Finished 10' Earthwork E <br /> CL <br /> Surface (Miscellaneous Areas) o <br /> Ivar. $9; 2 I 4- 4� c <br /> SHOULDER DETAILS _ O o ( Exist. <br /> LEFT RIGHT v Exist. 8% ____V�—_ ground <br /> — J _ ground I —�_— li �1-- Er <br /> Station to Station' Detail Station to Station Detail — „_1V FT <br /> I <br /> v, 0+12 to 25+05 _ 1 0+12 to 17+80 1 Im orted Borrow I I <br /> --- -- ----17+80 <br /> - -- -- -- 3 Existing Roadway p <br /> o - -- — — 0.17' Shoulder Backing <br /> 25+05 to 26+65 , 3 17+80 to 20+80 I <br /> 26+65 to 36+55 1 20+80 to 25+05 1 0.17' Shoulder <br /> - Backing Existing Roadway <br /> rn rn 36+50 to 44+60 2 25+05 to 26+05 3 <br /> - -- - <br /> 44+65 to 57+00 1 26+05 to 58+00 1 DETAIL 2 DETAIL 3 <br /> _ <br /> "' 57+00 to 58+00 3 <br /> z <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTIONS AND ARCHERDALE ROAD RESURFACING Sheet No. <br /> Q GENERAL NOTES (State Highway Route 26 to Baker Road) 2 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE I DATE APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.