My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4387 - SP4401
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4387 - SP4401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:06:00 AM
Creation date
1/23/2016 1:10:16 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Duncan Road Resurfacing
Limits
Copperopolis Road to State Hwy Route 26
Year
2007
Project Engineer
Kaila Cottal
Roads Worked
Duncan Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4387 - SP4401
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES <br /> 1 . The Contractor shall obtain on Encroachment Permit from <br /> f Caltron's for all work and signing within State Right of Way. <br /> 2. All earthwork except for final shoulder backing shall be completed <br /> Limits of Clearing and Grubbing prior to placing final lift of asphalt concrete and asphalt concrete <br /> and Mailbox Relocation. leveling. No Shoulder Backing shall be deposited or drifted onto the <br /> 11 '— 12' 11 '— 12' final lift of asphalt concrete surfacing. <br /> See See <br /> Shoulder 20'-22' Pavement Reinforcing Fabric Shoulder 3. Placement of Asphalt Concrete surfacing shall not begin until the <br /> Details Details <br /> Asphalt Concrete used in pavement repair has been in place for 18 <br /> Sheet 3 vor. vor._ Sheet 3 hours. <br /> 4. Shoulder Backing Material at oil intersection radii shall receive penetration <br /> ?5 L_______ ____ ________ ____________ _______J treatment at 0.25 gollon/square yard. Limits of the penetration treatment <br /> work shall be confined to intersection radii plus fifty feet (50') in each <br /> 0.25' A.C. Overlay direction or to intersection conform. <br /> N Existing Roadway TYPICAL SECTION <br /> 5. Asphalt Concrete shall be placed in two (2) layers of approximate <br /> 00 > Sto. 00+50 to Sta. 24+81 (22' Wide) q pavement reinforcing fabric placed between <br /> Sta. 28+10 to Sta. 31 +14 (22' Wide) a uol thickness with <br /> oexisting pavement and the first toyer. <br /> -n Sto. 32+73 to Sto. 49+00 (22 Wide) <br /> cF Sta. 49+00 to Sto. 164+27 (24' Wide) 6. All existing trees, shrubs, fences and other frontage improvements <br /> Z > are to remain In place unless otherwise noted. <br /> z rn IF 7. Removal of A.C. Dike shall be done in such a manner as to not <br /> o Cafst. damage the existing A.C. surface beneath. <br /> 8. Contractor shall remove, salvage, haul and the existing D Limits of Clearing and Grubbing stockpile 9 P� 9 M.B.G.R. <br /> and posts at the County's Corporot ion Yard located at 1810 E. Hozelton <br /> 11' 11 ' Ave., Stockton CA. Contractor shall call Son Joaquin County Maintenance <br /> See See at (209) 468-3074 forty—eight (48) hours prior to delivering salvaged <br /> V.0 Shoulder 20' Pavement Reinforcing Fabric Shoulder materials. <br /> (A Details Details <br /> rt Sheet 3 =vor. Var._ Sheet 3 9. Payment for removal and disposal of drainage pipe where indicated in <br /> the plans shall be considered as included in the Contract Lump Sum <br /> price for Clearing and Grubbing. <br /> r--------- -------------------------- ----� 10. Reference to Class "B" concrete in these Plans or Special <br /> 0.25' A.C. Overla Variable Depth A.C. Provisions shall be considered the some as Class 3 Concrete. <br /> Existing Roadway NPICAL SECTION Leveling Course <br /> y► Sto. 24+81 to Sto. 26+14 (22' Wide) <br /> Sta. 26+40 to Sta. 28+10 (22' Wide) <br /> Sto. 31 +14 to Sto. 32+73 (22' Wide) <br /> A <br /> A <br /> r+i <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION DUNCAN ROAD RESURFACING Sheet No. <br /> (Copperopolis Road to State Hwy Route 26) 2 of 15 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> Enrique Silva 11/07 , q d 7 I v 7 / ill` 'ill 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.