Laserfiche WebLink
PAVEMENT REPAIR DRIVEWAYS TYPE D <br /> Location Quontity Location Quantity <br /> 4 Locations Throughout Project 66 SY 15 Locations 156 SY <br /> PLANING ASPHALT CONCRETE PAVEMENT DRIVEWAYS TYPE E) <br /> Location Quantity Location Quantity <br /> State Higghway Route 88 Conform 64 Locations Including 5 Paved Frontages 1 ,042 SY <br /> Stc 10+20 to Sto 10+45 86 SY <br /> Garibaldi Road Conform <br /> Sto 9+37 to Sto 9+62 75 SY <br /> Veronica Street Conform PENETRATION TREATMENT <br /> Sto 10+37 to Sto 10+62 139 SY <br /> Joseph Leon Lane Conform Location Quantity <br /> Sto 10+38 to Sto 10+63 - 124 SY 8 Locafions Throughout Project 350 SY <br /> . Cherokee Road Conform (South) <br /> Sto 44+91 to Sto 45+16 149 SY <br /> i Cherokee Road Conform (North) <br /> o <br /> Sto 45+50 to Sto 45+75 130 SY <br /> CCTC Rol Rood Conform (South) ASPHALT CONCRETE <br /> Stc 62+33 to Sto 62+53 49 SY (TYPE B) <br /> v CCTC Rail Road Conform (North) <br /> m <br /> Sto 62+62 to Sto 62+82 49 SY Location - Quantity <br /> � Palmer Avenue Mainline Resurfacing 2,367 Tans <br /> ' n Sto 10+36 to Sto 10+61 67 SY Sto 10+70 to Stu 44+66 <br /> o Leonardini Road Conform (End of Project) Sto 46+00 to Sto 72+00 <br /> Sto 72+25 to Sto 72+50 61 SY Transitions at Intersections 165 Tons <br /> '—' Total 929 SY 7 Locations Throughout Project j4tr� <br /> (See Plans)mPovement Repair 23 Tons4 Locations Throughout ProjectADJUST MONUMENT FRAME AND COVER (inclu dingays (Types D n g 40 Tons <br /> (Includin Paved Frontages) Total 2,695 Tons <br /> Location Quantity <br /> et 1 Each <br /> Sta 37+27 4 62 �29' Rt) Joseph aLeon Lone 1 EachTotol 2 EachPAVEMENT REINFORCING FABRIC <br /> Location QuantitySlo 10+45 to Stc 44+91 9,189 SY <br /> SHOULDER BACKING Sto 45+75 to Sto 62+33 3,684 SYSto 62+82 to Sto 72+25 2,096 SYLocation Quantity Total 14,969 SYU� St10+20toSto 72+50 570 Tons f <br /> COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF QUANTITIES Cte Highway <br /> AVENUE RESURFACING sheet No. <br /> Q (State Highway Route 88 to Leonardini Road) 7 of 7 <br /> DRAWN BY I DATE PROJECT ENGINEER DATE CHECKED DATE I APPROVAL RECOMMENDED I DATE <br /> D. Gambini 2/07 a/re%� �st/z 'T1 I/Z/z70 <br />