My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4466 - SP4479
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4466 - SP4479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:11:15 AM
Creation date
1/23/2016 1:12:11 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Sidewalk Accessibility Improvements, Phase 5
Year
2008
Project Engineer
Awni Taha
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP4466 - SP4479
Type
Sidewalk Accessibility Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STORM DRAIN INLET PROTECTION MODIFY EXISTING CURB RAMPS RETROFIT CURB RAMP WITH DETECTABLE <br /> Location Quantity Location Quantity WARNING SURFACE <br /> 70 Locations Lump Sum 4 Locations 4 Each Location Quantity <br /> 22 Locations 22 Each <br /> REMOVING CONCRETE RELOCATE SPRINKLER SYSTEMS <br /> Location Quantity Location Quantity <br /> 192 Locations 3,103 S.Y. 14 Locations 17 Each <br /> Q ADJUST FRAME AND GRATE LAWN (SOD) <br /> (STORM DRAIN INLET) Location Quantity <br /> Location Quantity <br /> 148 Locations (Throughout Project) 571 S.Y. <br /> 59 Locations 59 Each <br /> - n <br /> � n <br /> 0 <br /> rr ASPHALT CONCRETE (MISC. AREAS) <br /> m <br /> RELOCATE ROADSIDE SIGN Location Quantity <br /> Location Quantity <br /> 192 Locations (Throughout Project) 485 S.Y. <br /> 6 Locations 4 Each <br /> MINOR CONCRETE <br /> ADJUST WATER VALVE (CURB, GUTTER AND SIDEWALK) <br /> Location Quantity Location Quantity <br /> Plymouth Rd/Inman Ave 1 Each 192 Locations (Throughout Project) 4,365 L.F. <br /> m <br /> m <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN vo scALE SUMMARY OF QUANTITIES SIDEWALK ACCESSIBILITY IMPROVEMENTS, Sheet No. <br /> PHASE 5 4 of 1a <br /> DRAWN BY DATE PROJECT ENGINEER DATE I DATE APPROVAL RECOMMENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.