Laserfiche WebLink
Conform at Existing Expansion Joint or <br /> Saw Cut and Conform at Existing Weakened <br /> Plane Joint or Score Mark (Typical) <br /> _ BCR <br /> D Exist. CG & S Place Truncated Domes <br /> \ \I Install New CG & S I at Curb Ramp per <br /> (TyocaQ RSP A88A (Typical) <br /> 1= <br /> \N Retaining Curb as <br /> necessary at back <br /> edge of Sidewalk <br /> n9 <br /> Widen Sidewalk as re wired, <br /> 1 :1 (Typ)*S, <br /> : see curb return ramp schedule. <br /> e <br /> y 8J ,_ �� - <br /> 8 (TypAdjust Existing <br /> SDI to Final W <br /> FL Grade <br /> or <br /> N .. <br /> 12" Front Edge— / �m <br /> of Sidewalk J r� <br /> A <br /> GUTTER DETAIL (Flowline) <br /> AT SDI LOCATIONS TYPE 1 RAMP <br /> NOTE: Section A-A, see sheet 8. <br /> All SDI Frames and Grates not connected to a centralized storm Conform at Existing Expansion Joint or <br /> F sewer system shall be reset to the original grade, unless Saw Cut and Conform at Existing Weakened <br /> otherwise directed by the Engineer. All other SDI Frames and II Plane Joint or Score Mark (Typical) <br /> Grates shall be installed 0.12' lower than the lowest existing BCR <br /> Flowline conform or as directed by the Engineer. } R & D Exist CG & S <br /> Place Truncated Domes <br /> g I � i\ i\I Install New CG & S at Curb Ramp per <br /> ffi (Typical) R.S.P. A88A (Typical) <br /> i <br /> Retainin Curb as <br /> m ^ <br /> inecessary at back <br /> I I \ ;\we 4 1 edge of Sidewalk <br /> 4 <br /> Widen Sidewalk as <br /> required, see curb <br /> of BJJ <br /> Face o! return ramp schedule. <br /> UFace of <br /> Poi F) �MM�'; <br /> L Curb C Curb / S. W .0X <br /> _- =T1a <br /> 4 <br /> LA/• 11 BCR ( �,y�� / <br /> t/J front Edge, � <br /> 0 of Sidewalk A <br /> (Flowline) <br /> • n <br /> p <br /> (Beginning of Radius is the most TYPE 2 RAMPSection A-A, see sheet 8. <br /> m westerly side of the intersection.) <br /> RAMP DETAILS <br /> COUNTY OF SAN JOA UIN No SCALE SIDEWALK ACCESSIBILITY IMPROVEMENTS, Sheet No. <br /> Q PHASE 5 of 1a <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />