My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4486 - SP4492
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4486 - SP4492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:15:43 AM
Creation date
1/23/2016 1:12:48 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Gawne Road Resurfacing
Limits
Mariposa Road to Van Allen Road
Year
2008
Project Engineer
Dan Gambini
Roads Worked
Gawne Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4486 - SP4492
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const <br /> - Limits of Clearing and Grubbing land Mailbox Relocation - <br /> 4' <br /> elocation 4' _-12' __ _ - - 12' - - - 4' - - 2 ' <br /> *22' Pavement Reilnforcing Fabric <br /> o a <br /> c 8% _Var Voo 8%,_ c <br /> o Var <br /> U! <br /> Shoulder Backing- L _ —T_ __ _ _ __ — _ _ — _ - - - - - - - - - - - -- - - - - - - - — __ _ _ _ — _ - Shoulder Backing <br /> Exist Roadway L0.25' AC Overlay) <br /> *Place Pavement Reinforcing Fabric TYPICAL SECTION 5h0K(�P QaCk!hq ✓:�e0 <br /> Sto 10+90 to Ste 173+50 Sta 10+30 to Sto 173+75 1'o b'r-�rarn �o <br /> p <br /> > u- <br /> 44 +�5 <br /> Const Const <br /> Edge of_ ETW 8 J \12 i E° 12' Edge <br /> Deck f <br /> o Deck AC Shoulder ETW�I <br /> i Existing MBGR—� <br /> � akb � iHMI!/�M�9F _ <br /> to remain in lace AC Shoulder <br /> /,`�Xa; e 1a / Existing MBGR <br /> (to remain in place) <br /> Vor y <br /> a o p <br /> Var <br /> A „ 0.04' `x <br /> Planed AC J <br /> Bridge Deck 0.17' <br /> -� 0.25' Surfacing Planed AC -' <br /> (Exist) AC Overlay Surfacing rJ Bridge Deck <br /> I rn 0.25 (Exist)AC Overlay <br /> BRIDGE DECK SHOULDER DETAIL 1 <br /> Ste 44+85 to Sto 45+50 (Both Sides) <br /> BRIDGE DECK SHOULDER DETAIL2 <br /> Sto 108+70 to Sto 109+34 (Lt) Sto 108+70 to Sto 109+34 (Rt) <br /> GENERAL NOTES: <br /> 1. 0.25 Asphalt Concrete Overlay shall be placed in two (2) Layers of approximate 4. All earthwork, except final grading of the shoulders, shell be completed prior to <br /> equal thickness with Pavement Reinforcing Fabric placed between the layers. placing final layer of asphalt concrete. No Shoulder Backing shall be deposited <br /> 2. Placement of Asphalt Concrete Overlay shall not begin until the Asphalt Concrete or drifted on the final layer of asphalt concrete surfacing. <br /> o used in Pavement Repair has been in place for 18 hours. 5. All existing trees, shrubs, fences and other frontage improvements are to <br /> n 3. The Contractor shall conduct Shoulder Backing operations so as not to disturb remain in place unless otherwise noted. <br /> or obstruct any existing drainage. 6. Shoulder Backing material at all intersection radii shall receive <br /> xr 9 penetration treatment <br /> at 0.25 gallon/square yard. Limits of penetration treatment work shall be confined <br /> to intersection radii plus fifty feet (50') in each direction or to intersection conform. <br /> z <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION, BRIDGE DECK GAWNE ROAD RESURFACING Sheet No. <br /> Q SHOULDER DETAILS & GENERAL NOTES (Mariposa Road to Van Allen Road) 2 of 7 <br /> DRAWN BY DATE ROJECT ENGINEER DATE I CHECKED DATE I APPROVAL RECOMMENDED DATE <br /> D. Gombini 1 9/07 Nov /�Str>5�l 5 Or iv AD8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.