My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4486 - SP4492
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4486 - SP4492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:15:43 AM
Creation date
1/23/2016 1:12:48 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Gawne Road Resurfacing
Limits
Mariposa Road to Van Allen Road
Year
2008
Project Engineer
Dan Gambini
Roads Worked
Gawne Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4486 - SP4492
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
PAVEMENT REPAIR ADJUST MONUMENT FRAME AND COVER ASPHALT CONCRETE TYPE B <br /> Location Quantity Location Quantity Location Quantity <br /> 11 Locations Throughout Project 1 ,261 SY Ste 41 +02 1 Each Mainline Resurfacing <br /> Ste 67+75 1 Each Ste 11 +30 to Ste 173+25 7,198 Tons <br /> Ste 94+29 1 Each Intersections: <br /> Ste 120+84 1 Each Stow Avenue <br /> PLANING ASPHALT CONCRETE PAVEMENT Total 4 Each Ste 10+12 to Ste 10+72 34 Tons <br /> Location Quantity Nelson Rood <br /> Ste 10+12 to Ste 10+62 30 Tons <br /> Gawne Road at Mariposa Road Berkeley Road <br /> Ste 10+30 to Ste 10+90 244 SY SHOULDER BACKING Ste 9+63 to Ste 9+88 11 Tons <br /> Bridge (29C-245) West Approach Location Quantity Security Road <br /> Ste 43+75 to Ste 44+85 293 SY Ste 10+05 to Ste 173+75 2,171 Tons Ste 9+63 to Ste 9+88 10 Tons <br /> Bridge Deck (29C-245) Country Road <br /> Ste 44+85 to Sta 45+50 231 SY Sta 10+12 to Ste 10+62 26 Tons <br /> Bridge (29C-245) East Approach Transitions: <br /> Ste 45+50 to Ste 46+68 315 SY Gawne Road at Mariposa Road <br /> Stow Avenue DRIVEWAYS TYPED Stu 10+30 to Ste 11 +30 54 Tons <br /> Ste 10+42 to Ste 10+72 90 SY Location Quantity <br /> Gowns Road of Van Allen Road <br /> Nelson Road 27 Locations 337 SY Ste 173+25 to Ste 173+75 48 Tons <br /> Ste 10+37 to Ste 10+62 81 SY <br /> a o Driveways (Types D & E) 83 Tons <br /> A Bridge (29C-244) West Approach Pavement Repair 420 Tons <br /> Ste 106+70 to Ste 108+70 533 SY Total 7,914 Tons <br /> z Bridge Deck (29C-244) DRIVEWAYS TYPE E <br /> Ste 108+70 to State11009+34 171 SY <br /> Bridge (29C-244) East Approach Location Quantity <br /> i <br /> Ste 109+34 to Ste 111 +85 669 SY 12 Locations 164 SY <br /> Country Road PAVEMENT REINFORCING FABRIC <br /> Ste 10+37 to Ste 10+62 69 SY Location Quantity <br /> Gawne Road at Van Allen Road Ste 10+90 to Ste 173+50 39,747 SY <br /> Ste 173+50 to Ste 173+75 223 SY PENETRATION_ TREATMENT Total 39,747 SY <br /> Total 2,919 SY Location Quantity <br /> 14 Locations Throughout Project 962 SY <br /> m <br /> z <br /> 0 <br /> COUNTY OF SAN JOAQUIN SUMMARY OF QUANTITIES GAWNE ROAD RESURFACING Sheet No. <br /> (Mariposa Road to Van Allen Road) 7 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> D. Gombini 9/07 -5fog . scg S� -3 'V> �s Gd <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).