My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4516 - SP4521
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4516 - SP4521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:18:16 AM
Creation date
1/23/2016 1:13:23 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing, Phase 4
Limits
Arroyo Way, Portola Avenue, San Gabriel Way, San Luis Way, San Pablo Way and Santa Rosa Way
Year
2008
Project Engineer
T. Sessoms
Roads Worked
Arroyo Wy., Portola Ave., San Gabriel Wy., San Luis Wy.
San Pablo Wy., Santa Rosa Wy.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4516 - SP4521
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR ADJUST FRAMES AND COVERS RETROFIT CURB RAMP PAVEMENT REINFORCING FABRIC <br /> Location Quantity AND FRAME AND GRATE DETECTABLE WARNING SURFACE Location Quantity <br /> PORTOLA AVENUE Location Quantity Location Quantity PORTOLA AVENUE <br /> (1 Location) 2 SY STORM DRAIN MAINTENANCE HOLES ARROYO WAY/SANTA ROSA WAY Ste 10+27 to Ste 23+15 2,129 SY <br /> SANTA ROSA WAY PORTOLA AVENUE NE Corner (Existing Romp) 1 Each SAN LUIS WAY <br /> Ste 11+521 (CL) 1 Each SE Corner (Existing Ramp) 1 Each Ste 10+15 to Ste 18+87 1 ,461 SY <br /> (4 Locations) 134 SY ARROYO Westside (Existing Ramp) 1 Each <br /> WAY <br /> TOTAL 136 SYSANTA ROSA WAY <br /> Ste 22+221 (CL) 1 Each TOTAL 3 Each <br /> PLANING ASPHALT SSte 25+02±te 27+951 1' (CL) 1 Each Ste 10+16 to Ste 18+89 1,464 SY <br /> (Lt) 1 Each <br /> Ste 19+19 to Ste 21 +25 372 SY CONCRETE PAVEMENT SANITARY SEWER M.AlNTENeuGE ASPHALT CONCRETE (TYPE B)HOLES SAN GABRIEL WAY <br /> Location Quantity SANTA ROSA WAY <br /> Location Quantity Ste 10+16 to Ste 18+91 1,662 SY PORTOLA AVENUE Ste 20+501 1' (Rt) 1 Each PORTOLA AVENUE <br /> Mainline 232 Tons ARROYO WAY <br /> Conform 27 Planing Area 200 Tons Ste 20+18 to Ste 30+67 2,020 SY <br /> Ste 10+02 to Ste 10+'� 167 SY ARROYO WAY Pavement Repair 1 Tons <br /> Ste �+95 to Ste 23+40 167 SY Ste 20+731 11 ' (Lt) 1 Each SAN PABLO WAY <br /> Planin923 GS Ste 23+581 8' (Lt) 1 Each SAN LUIS WAY Ste 13+09 to Ste 23+88 1 ,994 SY <br /> Ste 10+29 to Ste 2111 2,069 SY Ste 26+391 11 ' (Lt) 1 Each Mainline 166 Tons <br /> 02 23 .4v Ste 29+441 11' (Lt) 1 Each Planing Area 132 Tons TOTAL 11,102 SY <br /> SAN LUIS WAY Misc Area 1 ion <br /> Planing WATER VALVES MINOR CONCRETE <br /> D Ste 10+15 to Ste 18+87 1 ,584 SY PORTOLA WAY SANTA ROSA WAY (CURB, GUTTER & SIDEWALK) <br /> O Ste 10+10± 14' (Lt) 1 Each Mainline <br /> SANTA ROSA WAY 204 Tons <br /> Ste 10+13± 13' (Lt) 1 Each Planing Area 174 Tons Location Quantity <br /> m Conform 25' Ste 10+16± 14' Lt 1 Each Pavement Repair 45 Tons SAN LUIS WAY <br /> z <br /> Ste 21 +88 to Ste 21 +50 167 SY ( ) <br /> s Misc Area 1 Ton <br /> s Planing 90 Ste(119+26± 12' (Lt) 1 Each Ste 18+06 to Ste 18+ 10 (Rt) 4 LF <br /> Ste 10+16 to Ste 18+✓� 1 ,587 SY Ste 19+361 8' (Lt) 1 Each SAN GABRIEL WAY Ste 18+26 to Ste 18+30 (Rt) 4 LF <br /> Ste 19+39 to Ste 21 +90 339 SY Ste 22+08± 7.5' (Lt) 1 Each <br /> 20 SD Mainline 188 Tons <br /> SAN GABRIEL WAY SANTA ROSA WAY Planing Area 133 Tons SANTA ROSA WAY <br /> Ste 10+24 to Ste 10+30 (Rt) 6 LF <br /> Planing Ste 17+88± 10' (Lt) 1 Each ARROYO WAY Ste 13+47 to Ste 13+51 (Lt) 4 LF <br /> Ste 10+16 to Ste 18+91 1 ,590 SY Ste 20+62± 10' (Lt) 1 Each Mainline 224 Tons Ste 13+ to Ste 13+91 (Lt) 12$ LF <br /> Planing Area 152 Tons Ste <br /> �r-^^ 5+99 <br /> ARROYO WAY ARROYO WAY Misc Area 1 Ton `S 1S}7s Ste 15+90.50tDto+Q LZ -l-93 ") <br /> ( ) <br /> (Rt) 9 LF <br /> vJ Conform /B Ste 20+84± 11 ' Lt ` 8 LF <br /> Ste 19+93 to Ste 20+45 178 SY 1 Each ARROYO WAY <br /> laning <br /> Ste 23+67± 11 ' (Lt) SAN PABLO WAY <br /> P 1 Each s <br /> Mainline 221 TonSte 29+26 to Ste 29+38 (Rt) 12 LF <br /> � Ste 26+531 8' (Lt) 1 Each <br /> Ste ffi+rl� to Ste 30+67 1,640 5Y Planing Area 150 Tons SAN PABLO WAY <br /> l9 ya Ste 29+33± 8' (Lt) 1 Each 9 <br /> a Misc Area 1 Tons Ste 23+16 to Ste 23+49 (Rt) 33 LF <br /> E SANnPABLO WAY form STORM DRAIN INLETS <br /> n Ste 12+84 to Ste 13+" 167 SY SANTA ROSA WAY — <br /> r Planing Ste 10+27 (Rt) 1 Each SAhI Sn wA <br /> M Ste %3+34 to Ste 23+88 1,630 SY Corrections Bir /+� h - Vial E/JC/i4 _ 00+C-8 -b -moi 29t1� [Lk a LF <br /> z /2 84 TOTAL 22 Each No Changes Ey <br /> 0 <br /> TOTAL 11,285 SY Dale /- d5 - d J{n 204 1-2 {- s-(q -,v+2? (L4;) C Lr <br /> Any Person Using 1 his Drawing Should Verify S4q 21+74 32 L.F <br /> e: 7'oTsrL 139 LP <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING, PHASE 4 Sheet No. <br /> (NWM WAY, P01MIA IME, SW GOVE1 WAY, SAN LL6 W1Y, SMI PMW W1Y d SWIA RM WMY) 6 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL MMENDED DATE <br /> RECO <br />
The URL can be used to link to this page
Your browser does not support the video tag.