My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4525 - SP4529
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4525 - SP4529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:19:44 AM
Creation date
1/23/2016 1:13:39 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Star Street Pavement Repair
Limits
State Highway Route 12 to 125' South
Year
2008
Project Engineer
Bernard Raiz
Roads Worked
Star St.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
CrossRef
SP4525 - SP4529
Type
Pavement Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
swings of Record <br /> PAVEMENT REPAIR 8" THERMOPLASTIC <br /> Location Quantity TRAFFIC STRIPE - ---- "` <br /> Sto. 19+65 18' Rt. 168 S.Y. Location Quantity pate ----- <br /> Ste 18+92 to Ste. 19+75 178 L.F. <br /> 12' <br /> i <br /> v <br /> Q ASPHALT CONCRETE (TYPE A) <br /> N Location Quantity Existing <br /> Surface <br /> Ste. 19+65 (18' Rt.) 112 Tons — - — <br /> THERMOPLASTIC PAVEMENT <br /> MARKINGS <br /> N Location Quantity 00' Asphalt Concrete <br /> REPLACE FRAME AND COVER s Locations <br /> 3 <br /> 3 White Type III (L) Arrow 42 S.F. <br /> p (SANITARY SEWER MAINTENANCE HOLE) While Type III (L) Arrow 42 S.F. <br /> E White Type 11 (R) Arrow 45 S.F. PAVEMENT REPAIR <br /> g Location Quantity Total 129 S.F. <br /> m Ste 19+12 (16' Rt.) 1 EA. <br /> n �0 <br /> d m <br /> NOTE <br /> u <br /> Asphalt concrete shall be placed in three (3) layers. The <br /> o " lowest layer shall not not exceed 0.45' in thickness, <br /> 12 THERMOPLASTIC the middle layer shall not exceed 0.40' in thickness, and <br /> TRAFFIC STRIPE the top layer shall be 0.15' in thickness. Placement of <br /> PAVEMENT MARKERS second layer may commence when the lowest layer is <br /> Location Quantity thoroughly compacted. The top layer shall be placed at <br /> Location Quantity least 12 hours after the placement of the second layer. <br /> !\ a Ste 19+84 50 L.F. Temporary asphalt concrete tapers should be placed at <br /> V o Sta. 19+65 18' Rt. 8 EA. pavement repair so that no more than 0.10' drop remains <br /> A <br /> f at the end of the first day. <br /> m <br /> A <br /> r <br /> m <br /> rw Z <br /> COUNTY OF SAN JOA UIN No SCALE SUMMARY OF QUANTITIES STAR STREET PAVEMENT REPAIR Sheet No. <br /> Q AND CONSTRUCTION DETAILS (State Highway Route 12 to 125' South) 5 of 5 <br /> DRAWN BY DATE PROJECT ENGINEER DATE DATE <br /> %=rrgrdo <br /> cnRol . ° p � <br /> mlra <br />
The URL can be used to link to this page
Your browser does not support the video tag.