Laserfiche WebLink
10' <br /> 4' Min. Edge of pavement Eorthwork <br /> Existing See Note Below (Embankment pROFESS/0y <br /> Surface New A.C. Dike Repair) QST P D. <br /> Approx. Slope W <br /> M No. 38465 <br /> 1 .5' Conform * r"v 3-31-09 <br /> 1.00' Asphalt Concrete Existing Roadway <br /> Note: Width (4' minimum). <br /> Approximate dimensions and locations used for estimating Compact existing native to 90% \y\�� Existing C <br /> purposes are available upon request. Dimensions and compaction (top 1 ') and place Imported \�\\\ Ground 08 <br /> locations are subject to change of Engineer's discretion. Borrow to 90% compaction (top 1') <br /> rn <br /> PAVEMENT REPAIR DETAIL EMBANKMENT REPAIR DETAIL Peter D. ng ne <br /> Reg.stered Civil Ener 38465 <br /> Regi <br /> GENERAL NOTES: <br /> 1 . All earthwork (except for final shoulder grading shall be completed prior to placing final lift of asphalt <br /> concrete. No Shoulder Backing shall be deposited or drifted on the final lift of asphalt concrete <br /> surfacing. Where the Shoulder Backing placement exceeds 0.30' in thickness, the Shoulder Backing shall <br /> be placed in two fully compacted layers. LEGEND <br /> 2. Existing drainage facilities shall remain in place unless otherwise noted. The Contractor shall conduct <br /> earthwork operations so as not to modify or obstruct the existing drainage. <br /> ® Variable Depth Asphalt Concrete <br /> 3. All existing trees, shrubs, fences and other frontage improvements are to remain in place unless Overlay <br /> otherwise noted. <br /> 4. Placement of asphalt concrete overlay shall not begin until the asphalt concrete used in pavement repair Earthwork (Embankment Repair) <br /> has been in place for 18 hours. <br /> 5. Removal of A.C. Dikes where shown on the plan shall be done in such a manner as not to damage the 0 Wetlands <br /> A m existing A.C. surface below the dike. <br /> z 6. Asphalt Concrete Overlay shall be placed 0 00' Depth of Asphalt Concrete <br /> m0.20' Asphalt Concrete Surfacing shall be placed in One (1) Layer with Pavement Reinforcing Pavement Planing <br /> Fabric placed on existing surface. a Limits of Asphalt Concrete <br /> 0.25' Asphalt Concrete Surfacing shall be placed in Two (2) Layers of approximately equal Pavement Planing <br /> thickness with Pavement Reinforcing Fabric between the layers. R Conform to Existing Radii <br /> 7. Shoulder Backing Material at all intersection radii shall receive penetration treatment at 0.25 <br /> gallon/square yard. Limits of the, penetration treatment work shall be confined to the intersection radii R & D Existing Asphalt Concrete Dike. <br /> plus fifty feet (50') in each direction or to the intersection conform. Place A.C. Dike (Type A) (High Dike) <br /> 8. The Contractor shall place bright orange temporary fencing at two locations as directed by the Engineer R & D Existing Asphalt Concrete Dike. <br /> to protect the drip line of Elderberry shrubs. Temporary informational signing, provided by the Engineer, Place A.C. Dike (Type C) (Low Dike) <br /> v, shall also be installed at these sites. Payment for furnishing and placing fencing and installing <br /> 'v informational signing will be paid under Item No. 25 Supplemental Work. <br /> z 9. The Contractor shall place Straw Waddles as directed by the Engineer to protect the Depressional <br /> E Wetland shown on the plans. Payment for furnishing and placing straw waddles will be paid under <br /> Item No. 25 Supplemental Work. <br /> �\ A <br /> ( w ., 10. Embankment Repair work shall be benched a minimum of 2' into existing slope. <br /> v{111b o <br /> COUNTY OF SAN d JOA UIN NO SCALE CONSTRUCTION DETAILS TRACY BOULEVARD RESURFACING Sheet No.Q AND GENERAL NOTES (Plata Road to Howard Road) 2 of 11 <br /> DRAWN BY DATE PROJECT ENGIN ER I DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> A ) <br />