Laserfiche WebLink
Limits of Clearing & Grubbing v v Limits of Clearing and Grubbing _ <br /> FSI__ 16'�r.-. ._ 16' 16' 16' <br /> 45'-55' 45 55 <br /> 4.5'-5.5' tlwoy Details Details (Rootl:a ( <br /> Eorlhwork 11 '-12' 11'-12' adhwork _ _ <br /> (Roadway 11'-12' 11'-12' Roatlwa <br /> See Widening) Line GUS Line CuI Widening See W'tl°^'"g7l Line Cut I 1 w'tl°"'" <br /> Shoulder I Shoulder See See <br /> Details 28' Pavement Rfinforcing Fabric shoamer 0.50' o' snoamer <br /> Son 0.50' 0.50� 'r- on —2% p% Details <br /> Sheet 2% ^' Va_. 2% Sheet on 1-5%-Z% on <br /> No. 3 No. 3 Sheet - - - - Sheet <br /> w No. 3 No. 3 <br /> Existing Roadway, 0.17 -0'21 0.15 A.C. A.C. Leveling Existing Roadway <br /> 0.32'-0.36' A.C. Overlay <br /> A.G. TYPICAL SECTION ASPHALT CONCRETE TYPE B (LEVELING) <br /> Sto. 10+12 to Sta. 60+25 = 0.21' A.C. Overlay Sta. 47+00 to Sto. 50+00 (Lt.) <br /> Sto. 63+75 to Sto. 77+00 = 0.21' A.C. Overlay <br /> m Sto. 77+00 to Sto. 151 +03 = 0.17' A.C. Overlay GENERAL NOTES: <br /> n1 . Placement of asphalt concrete shall not begin until the asphalt concrete <br /> o used in Pavement Repair hos been in place for 12 hours. <br /> n 2. Asphalt Concrete shall be placed in (2) two layers of approximate equal <br /> thickness with reinforcing fabric placed on the existing or prepared surface. <br /> 0 o w w C JI w w 3. The Contractor shall conduct the Shoulder Backing operation so as not to <br /> iT a v I v a disturb or obstruct any existing drainage. <br /> 16 Limits of Clearing & Grubbing - 4. Shoulder Backing Material of all intersection radii shall receive penetration <br /> y m 'Eorlhwork 11 '_12' g 11 '-129 treatment of 0.25 gallon/square yard. Limits of the penetration treatment <br /> 4.5'-S.S' T work shall be confined to intersection radii plus fifty feet (50') in each <br /> -4orrtn ark - direction or to intersection conform. Payment for penetration treatment <br /> (RoodwoYy �Roodway should be considered as included in the price paid for Shoulder Backing. <br /> H flNo. 3 <br /> Widening) Line Cut I Line Cul Widening) See <br /> on ~, Shoulder 5. All earthwork, except for final shoulder grading shall be completed <br /> 28' Pavement inforcin Fabric <br /> 9 y Details prior to placing the final lift of Asphalt Concrete surfacing. <br /> 0.50' ' 0.50' on 6. Roadway widening shall be laced prior to A.C. overlay. Material for roadway <br /> Street Y 9 P P Y Y <br /> No. 3 widening may be deposited and spread by any mechanical means that will <br /> I___ ___ ___ __J produce a uniform smoothness and texture. <br /> __. 0.21 ' 0.15 A.C. 7. All existing frontage improvements shall remain in place unless otherwise noted. <br /> 0.36' A.C. Existing Roadway A.C. Overlay 8. Existing drainage facilities shall remain in place unless otherwise noted. <br /> The Contractor shall conduct earthwork operations so as not to modify or obstruct <br /> TYPICAL SECTION the existing drainage. <br /> o / � 9. Where superelevotions exist on horizontal curves, surface slope and drainage shall <br /> (Superelevotion) - i >> a�+: j si- -a conform with existing. <br /> • <br /> SID. 60+25 to Sto. 631 ' <br /> A .r erowK gv _ 10. All existing materials from roadway cut shall be used as roadway fill in fill areas. <br /> r r^ <br /> -v All organic material shall be removed from roadway cut prior to placing into fill areas. <br /> 11. Decorative frontages within the limits of work shall be removed within 4' of new <br /> w <br /> edge of pavement. Payment for this work will be paid by Force Account. <br /> s� COUNTY OF SAN JOAQUIN No scALE TYPICAL SECTION <br /> AUSTIN ROAD IMPROVEMENTS Sheet No. <br /> (Louise Avenue to French Camp Road) 2 of 12 <br /> DRAWN BY DATE '/PROJECT ENGINEER PATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> Enrique Silva 11/07 111,,& CHAP ufa� NKa7 <br />