My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4610 - SP4621
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4610 - SP4621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:17:31 PM
Creation date
1/23/2016 1:15:30 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Austin Road Improvements
Limits
Louise Avenue to French Camp Road
Year
2007
Project Engineer
Kaila Cappel
Roads Worked
Austin Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4610 - SP4621
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> _ Limits of Clearing SHOULDER SCHEDULE SHOULDER SCHEDULE <br /> and Grubbing <br /> 2'-4' Earthwork 11'-12• zaw) w (ZLV7-nf LGGI7.CJY Mtwr SinV F <br /> (Roadwoy I Ste. 10+12 to Ste. 27+00 B Ste. 10+12 to Ste. 13+00 A L>aut <br /> Widening) i Sto. 27+00 to Sto. 30+00 D Ste. 13+00 to Sta. 22+00 B Limits of Clearing 1 <br /> Conform- 2y i Ste. 30+00 to Ste. 39+00 B Sto. 22+00 to Sta. 23+00 A Earthwork and Grubbing <br /> I Sto. 39+00 to Sta. 41+00 A Ste. 23+00 to Ste. 24+00 C (Mist. Areas) <br /> Existing Roadway�l Eafthwafk <br /> Ste. 41 +00 to Sto. 47+00 B Ste, 24+00 to Ste. 47+00 B 2' F4'- <br /> Shoulder Backing- (Road we <br /> 0.5' Line Cut Sta. 47+00 to Ste. 50+00 C Ste. 47+00 to Sta. 49+00 A Widening <br /> 0.32'-0.36' A.C. <br /> Sta. 50+00 to Sto. 56+00 B Ste. 49+00 to Sta. 55+00 C `v__ <br /> SHOULDER DETAIL A Cfe7. --2%- <br /> Sto. 56+00 to Sta. 58+00 A Sto. 55+00 to Ste. 60+00 a Conform <br /> F Ste. 58+00 to Sto. 83+00 B Ste. 60+00 to Ste. 63+00 E _ Existing Roadway <br /> Giw1IsG � - <br /> Limits of Clearin Ste. 83+00 to Ste. 84+00 D Ste. 63+00 to Ste. 74+00 B Shoulder Backing - �L0.5' Line Cut <br /> and Grubbing Sta. 84+00 to Ste. 86+00 B Ste. 74+00 to Ste. 76+00 C I Imported or <br /> P 0.32'-0.36' A.C. <br /> m 2, �4, Earthwork 11 12' Sto.Sto. 86+00 to Sto. 89+00 D Sta. 76+00 to Sta. 85+00 B Local Borrow <br /> a ' (Roodwo I <br /> P Widening i Sta. 89+00 to Sta. 91 +00 B Sta. 85+00 to Sto. 92+00 q SHOULDER DETAIL D <br /> Conform — zz —��� i Ste. 91 +00 to Ste. 94+00 C Ste. 92+00 to Sto. 117+00 B <br /> Ns i _ Ste. 94+00 to Ste. 97+00 A Ste. 117+00 to Sta. 121 +00 A <br /> 8 — Existing Roadway <br /> $ - - - - - ( Sta. 97+00 to Sta. 100+00 D Ste. 121+00 to Ste. 122+00 C <br /> F Shoulder Backing- <br /> c X0.5' Line Cut Sto. 100+00 to Ste. 104+00 B Ste. 122+00 to Ste. 127+00 A <br /> w i 0.32'-0.3IF <br /> 6" A.C. r�asrt <br /> s Ste. 104+00 to Ste. 108+00 D Sta. 127+00 to Sta. 151+03 B Imported or <br /> rn I Limits of Cleoria ocal Borr <br /> A m SHOULDER DETAIL R Ste. 108+00 to Ste. 110+00 8 <br /> n and rubbing <br /> Ste. 110+00 to Ste. 111+00 D ! Earthwork <br /> 0le <br /> ,�. cAut Sto. 111+00 to Ste. 114+00 B I arlhwor (Misc. Areas) <br /> Limits of Clearing ) 11 -12 4'1f4' <br /> and Grubbing Ste. 114+00 to Ste. 117+00 C (Roadway <br /> Earthwork Ste. 117+00 to Sta. 121+00 B Widening) <br /> (Misc. Areas <br /> Earthwork I Sta. 121 +00 to Ste. 126+00 D <br /> 12" 4" 11'-12�.--r <br /> (Roadway r I Sta. 126+00 to Ste. 139+00 B I `�� fij �z <br /> Conform Widening) <br /> Ste. 139+00 to Ste. 141+00 A Existing Roadway + /Conform <br /> i - - _ r- - <br /> w <br /> Ste. 141 +00 to Sta. 143+00 B <br /> o Existing Roadway i Sta. 143+00 to Ste. 149+00 C 0.5' Line Cul Shoulder Backing <br /> o Shoulder Backing - - - - 0.32'-0.36' A.C. Imported or <br /> f 0.32'-0.36' A.C. <br /> J �-0.5' Line Cut Ste. 149+00 to Ste. 151+03 B ,V Local Borrow <br /> z <br /> SHOULDER DEMIL <br /> m SHOULDER DETAIL C W e17 'F��I - (Superelevation) <br /> r y, <br /> e N wcnx <br /> F40 <br /> COUNTY OF SAN JOAQUIN NO scALE SHOULDER DETAILS AUSTIN ROAD IMPROVEMENTS Sheet No. <br /> (Louise Avenue to French Camp Road) 3 of 12 <br /> DRAWN BY DATE PROJECT ENGINEER DTE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.