My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4658 - SP4667
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4658 - SP4667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:19:15 PM
Creation date
1/23/2016 1:16:42 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Colonial Heights Resurfacing Phase 3
Limits
Balboa Avenue, Cortez Avenue, Portola Avenue, and Solano Avenue
Year
2007
Project Engineer
Jerry Violett
Roads Worked
Balboa Ave., Cortez Ave., Portola Ave., Solano Ave.
Red Lines
No
Supplemental fields
Cross Ref
SP4658 - SP4667
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLANING ASPHALT ADJUST FRAMES AND COVERS ASPHALT CONCRETE (TYPE B) RETROFIT CURB RAMP <br /> CONCRETE PAVEMENT Location Quantity Location Quandt DETECTABLE WARNING SURFACE <br /> Quantit <br /> Location y STORM DRAIN MAINTENANCE HOLES y Location Quantity <br /> SOLANO AVENUE SOLANO AVENUE MainSOLLi AVENUE <br /> Main Line 251 Tons SOLANO AVE PALOMA AVE <br /> Sta 10+11 to Sta 23+57 2,646 SY Sta 18+043 (CL) 1 Each / <br /> Planing Area 238 Tons NW Corner ( 1 Each <br /> Sto 20+243 (CL) 1 Each Misc Areas i Ton ( 9 ADA Ram P) <br /> Sto 0 AVENUE CORTEZ AVENUE NE Corner (Existing ADA Ramp) 1 Each <br /> Sta 0+15 to Sta 2+85 518 SY Sto 1+553 (CL) 1 Each CORTEZ AVENUE S/S of Paloma (Existing ADA Ramp) 1 Each <br /> Main Line 61 Tons <br /> BALBOA AVENUE BALBOA AVENUE Planing Area 47 Tons SOLANO AVE/SANTA ROSA AVE <br /> Sto 17+093 3'(Lt) 1 Each Misc Areas 1 Ton NW Corner (Existing ADA Ramp) 1 Each <br /> Sta 13+61 to Sta 28+57 2,657 SY Sta 20+363 2'(Lt) 1 Each SW Corner (Existing ADA Ramp) 1 Each <br /> BALBOA AVENUE <br /> Sto 23+76f 2'(Lt) 1 Each E/S of Solana (Existing ADA Ramp) 1 Each <br /> Main Line 457 Tons <br /> PORTOLA AVENUE Sta 27+163 2'(Lt) 1 Each Planing Area 241 Tons <br /> Sta 10+20 to Sta 21+76 2,144 SY 0 Tons BALBOA AVE/PALOMA AVE <br /> SANITARY SEWER MAINTENANCE HO Misc Areas <br /> BALBOA AVENUENW Corner (Existing ADA Ramp) 1 Each <br /> TOTAL 7,965 SY PORTOLA AVENUE SW Corner (Existing ADA Romp) 1 Each <br /> Sto 15+253 5'(Rt) 1 Each Main Line 200 Tons <br /> Sto 18+64t 5'(Rt) 1 Each Planing Area 193 Tons BALBOA AVE BARCELONA AVE <br /> Sto 22+05t 5'(Rt) 1 Each Misc Areas 2 Tons Westside (Existing ADA Ram 1 Each <br /> PAVEMENT REINFORC9FABRIC Sto 25+433 5'(Rt) 1 Each ( 9 P) <br /> 'n WATER VALVES TOTAL 1,692 Tons TOTAL <br /> o Location CORTEZ AVENUE 9 Each <br /> I <br /> SOLANO AVENUEsta 1+473 2'(Lt) Each MINOR CONCRETE <br /> Sto 10+36 to Sto 23+07 TOTAL 12 Eacn (CURB, GUTTER & SIDEWALK) <br /> CORTEZ AVENUE Location Quantity <br /> Sta 0+07 to Sta 2+93 PAVEMENT REPAIR SOLANO AVENUE <br /> BALBOA AVENUE Sto 11 +69 to Sta 11+73 Lt) 4 LF <br /> Sta 13+86 to Sta 28+56 4,039 SY Location Quantity Sta 19+20 to Sta 19+28 �Rt) 8 LF <br /> PORTOLA AVENUE CORTEZ AVENUE <br /> PORTOLA AVENUE (2 Locations) 10 SY Sto 1 +55 to Sto 1+59 (Rt) 4 LF <br /> Sta 10+12 to Sta 21 +51 1,826 SY Sto 2+04 to Sto 2+24 (Rt) 20 LF <br /> TOTAL 8,747 SY TOTAL 10 SY Sto 2+25 to Sto 2+28 (Lt) 3 LF <br /> 1 <br /> PORTOLA AVENUE <br /> Sta 12+50 to Sto12+62 (Lt) 12 LF <br /> P Sto 12+91 to Sto 12+97 Rt) 6 LF <br /> a Sta 13+96 to Sto 14+00 (Rt) 4 LF <br /> Sto 14+75 to Sto 14+87 (Lt) 12 LF <br /> Sta 16+70 to Sto 16+75 (Lt) 5 LF <br /> Sto 17+84 to Sto 17+97 Rt) 13 LF <br /> c^ o TOTAL 91 LF <br /> _ l <br /> NO SCALE SUMMARY OF QUANTITIES COLONIAL HEIGHTS RESURFACING PHASE 3 Sheet No. <br /> (BALBOA AVE, CORTEZ AVE, PORTOLA AVE, & SOLANO AVE) 10 of 10 <br /> COUNTY OF SAN JOAQUIN <br /> DRAWN EY DATE ROJECT ENGINEER DATE E ED DATE APPROVAL RECOMMENDED DATE <br /> �F;.� co«,,,.,. n Z U_i _ . . i. A .1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.