My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4673 - SP4676
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4673 - SP4676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:20:25 PM
Creation date
1/23/2016 1:17:11 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Jack Tone Road Resurfacing
Limits
State Highway Route 120 to French Camp Road
Year
2009
Project Engineer
Hadi Tabatabaee
Roads Worked
Jack Tone Rd.
Red Lines
No
Federal #
ESPL-5929(198)
Supplemental fields
Cross Ref
SP4673 - SP4676
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAVEMENT REPAIR SHOULDER BACKING ASPHALT CONCRETE (TYPE A) <br /> Location Quantity Location Quantity Location Quantity <br /> 3 Locations throughout Project 269 SY Sto 171 +08 to Sto 275+73 2,074 Tons Mainline <br /> Sta 172+08 to Sto 274+73 6,150 Tons <br /> Total 2,074 Tons <br /> Transition Areas Jack Tone Road <br /> PLANING ASPHALT Sta 171+08 to Sto 172+08 61 Tons <br /> CONCRETE PAVEMENT DRIVEWAYS (TYPE D) Sto 274+73 to Sto 275+73 44 Tons <br /> Transition Areas Louise Avenue <br /> Location Quantity Location Quantity Sto 10+36 to Sto 10+86 22 Tons <br /> Sto 9+14 to Sto 9+64 17 Tons <br /> Bea'nn'na of Project 8 Locations 247 SY <br /> Sta 171+08 to Sto 171 +58 309 SY140 Tons <br /> Louise Ave <br /> Total 247 SY Driveways (Types D & E) <br /> Sta 9+14 to Sta 9+39 67 SY Pavement Repair 126 Tons <br /> Sta 10+61 to Sta 10+86 73 SY <br /> End of Proiect DRIVEWAYS (TYPE E) Total s,sso Tans <br /> Stu 275+23 to Sta 275+73 190 SY <br /> Thermoplastic Traffic Stripes and Pavement Location Quantity <br /> Markings PAVEMENT REINFORCING FABRIC <br /> 14 locations throughout project 56 SY 10 Locations 796 SY <br /> Total 796 SY Location Quantity <br /> n Total 695 SY <br /> � Sta 171 +58 Lt to Sta 275+23 Lt 13,820 SY <br /> 'o Sta 171 +58 Rt to Sta 275+11 Rt 13,804 SY <br /> ADJUST FRAMES AND COVERS PENETRATION TREATMENT Total 27,624 SY <br /> LI_c . tipn _ Quantity <br /> Location Quantity <br /> MONUMENTS Sic 171+08 to Sta 171+83 (Lt) 36 SY <br /> Sto 171+08 to Sto 172+16 (Rt) 39 SY <br /> Sto 196+87 CL 1 Each Sto 222+21 to Sto 223+16 (Lt) 59 SY <br /> Ste 223+43 CL 1 Each Sta 222+45 to Sto 223+26 (Rt) 55 SY <br /> Sto 250+00 CL 1 Each Sta 223+45 to Sto 224+28 (Lt) 53 SY <br /> PULL BOXES Sto 223+54 to Sto 224+33 (Rt) 54 SY <br /> v, Sto 171 +30 27' Lt 1 Each <br /> ( ) Total 296 SY s <br /> Sta 173+21 25' (Lt) 1 Each No. J9165 <br /> Sto 175+07 25' (Lt) 1 Each ; 2e <br /> Sta 177+84 24' (Lt) 1 Each C1V11 FF°� <br /> v 4 CIZ <br /> c' HAND HOLES <br /> n <br /> f Sta 171+30 6' (Lt) 1 Each <br /> F Total 8 Each <br /> W / <br /> � <br /> F <br /> z Peter D. Martin <br /> o RCE 38485 <br /> COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES JACK TONE ROAD RESURFACING sheet <br /> (State High4way Route 120 to French Camp Road) 4 of 4 <br /> DRAWN BY DATE PROJECT E14GINEER DATE CHECKED I DATE APPROVAL R COMMENDED I DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.