Laserfiche WebLink
Southland 4't x 4't x 0.25' <br /> 4't Exist Pavement Width •T• Exist Pavement Width 4't Concrete Apron with <br /> I 4-#4 bars each way <br /> 18"0Frame and Grate Existing Roadway a- (Typ) <br /> w <br /> (Typ) <br /> -1 Min <br /> ( ) <br /> Slur Cement <br /> Backfill�>� <br /> Construct 18"0 SDI rY <br /> (Modified) (Typ) <br /> .:.;..:::>; 4„ (Typ) <br /> Place 12" 0 Alternate Pipe (See Note 1) <br /> r-l —t(TY <br /> p) 12" (TYP) NOTES: <br /> 6" (Min) <br /> 1-1/2"x3/4" SECTION A—A (CROSS DRAIN) 1. Allowable Alternate Pipes are Reinforced <br /> Clean Crushed Rock 6„ (Typ)f Concrete Pipe (Class III) and Corrugated <br /> under SDI (Typ) 30 Steel Pipe (0.079" thick) <br /> (Typ) 6" Dia drain hole 2. Concrete Aprons shall be considered paid <br /> (Typ) for under the various items of work. <br /> CL <br /> See Sheet 6 for Concrete Apron Detail. <br /> 'L 3. See Sheet 6 for Trench Detail Under <br /> Ln <br /> :Z: <br /> Existing-� Const Pavement. <br /> Fence to Limits of Clearing and Grubbing <br /> CD Remain and Earthwork (Miscellaneous Areas) Varies <br /> C N <br /> 2Varies 4' I I <br /> 0 L <br /> �, 0.25' Shoulder <br /> ,= <br /> j <br /> Sta 112+ <br /> 12 <br /> Existing 13 <br /> ackfing� TBM Nail on JP Southland <br /> o V°r ------ <br /> __,,wa ( e )Ground <br /> m c -- -" <br /> ELEVATION = 101.00 v <br /> z --- I Exist Roadway ( :'` `,` v <br /> m Top of New berm shall <br /> be 2't higher than o °o <br /> SECTION B— Grate Grate <br /> New adjacent EP elevation B ,' ;' <br /> EARTHWORK (MISCELLANEOUS AREAS Elevation Elevation <br /> y 99.75 . ` `. I 99.25 <br /> Total = Approximately 150 LF <br /> Exist Fence <br /> A A <br /> Exist Fence to Remain <br /> to Remain <br /> s EP ;., - EP <br /> \ I <br /> Const <br /> o uta" L0 Prescott: Sta 36+39 <br /> n +I P R E S C 0 T T B + Ln <br /> Southland: Sta 112+77 0 + R 0 A D <br /> M <br /> 35 36 37 <br /> M <br /> z <br /> � S <br /> COUNTY OF SAN JOAQUIN No SCALE CONSTRUCTON DETAILS PRESCOTT ROAD RESURFACING Sheet No.of 8 <br /> DRAWN BY DATE PROJECT EN INEER DATE CHECKED DATE <br /> L. Aguilar 1/11 - 1IZLIu <br /> i <br />