My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4751 - SP4754
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4751 - SP4754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:29:55 PM
Creation date
1/23/2016 1:19:23 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Liberty Road Resurfacing
Limits
Lower Sacramento Road to State Highway Route 99
Year
2010
Project Engineer
P.T.
Roads Worked
Liberty Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4751 - SP4754
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> Limits of Clearing and Grubbing <br /> 12' -T- 12' <br /> , <br /> 2 2 22' Pavement Reinforcing Fabric 2 2 <br /> Conform t tea% _ Var Var, 89� Conform GENERAL NOTES <br /> 1. Placement of Asphalt Concrete surfacing shall not <br /> begin until the Asphalt Concrete used in Pavement <br /> Repair has been in place for 18 hours. <br /> 0.25' Overlay <br /> Existing Roadway TYPICAL SECTION Shoulder Backfin T 2. Asphalt Concrete shall be placed in two (2) layers of <br /> g ( yp) approximate equal thickness with Pavement Reinforcing <br /> Sta 0+27 to Sta 25+82 Fabric placed between existing pavement and the first layer. <br /> - 3. The Contractor shall obtain an encroachment permit <br /> from CalTrans prior to work within the State Highway R/W. <br /> CI nst. <br /> o <br /> Clearing anGrubbing Limits of Cld Gbbing o 4. The Contractor shall conduct the Shoulder Backing operation <br /> 0 0 so as to not disturb or obstruct any existing drainage. <br /> 0 36 �, <br /> ° 6''I` Pavement Reinforcing Fabric 'l`6' ° <br /> 22' 5. All earthwork, except for the final lift of Shoulder Backing, <br /> Limits of Limits of 3 shall be completed prior to placing the final lift of Asphalt <br /> Planing Planing Concrete surfacing. No Shoulder Backing shall be deposited <br /> D Var Var. Var Var or drifted on the final lift of Asphalt Concrete surfacing. <br /> D r 6. The Contractor shall remove Asphalt Concrete from shoulder <br /> .10' 0.10' at stations 14+13 and 14+80 (left). Payment for removal <br /> r <br /> m of existing Asphalt Concrete shall be considered and paid <br /> Z :::� <br /> TYPICAL SECTION 0.25' Overlay for under the Clearing and Grubbing item of work. <br /> m Existing Roadway Sta 25+82 to Sta 27+22 (Lt) <br /> Sta 25+82 to Sta 27+62 (Rt) 7. Shoulder Backing material at all intersection radii shall receive <br /> penetration treatment at 0.25 gallon/square yard. Limits of the <br /> penetration treatment shall be confined to the intersection radii <br /> Const. plus ten feet(50') in each direction or to the intersection conform. <br /> oLimits of Clearing and Grubbing o 8. Material generated from planing may be thoroughly blended with <br /> 0 0 native material and compacted to 90% relative compaction in <br /> 0 6,* 24'-36' 6,* --h Shoulder Backing area. Planed material shall be topped. with a <br /> 22' Pavement Reinforcing Fabric 0 minimum of 0.10' Shoulder Backing. <br /> Limits of Limits of <br /> .,� Planing Planing <br /> 9. The Contractor shall be responsible for adequately scheduling <br /> ` <br /> inspection <br /> rlnnsfacilities <br /> under_VarVar_ Var coactnAlltetinghall cconformto the StandardSpecifications.7777= 77 <br /> h <br /> ,SII re-tos ►g� all be paid by the Contractor. <br /> s0.04' tf r <br /> � ' Overla <br /> Existing Roadway TYPICAL SECTION0.25yl s . <br /> m AC dike to Remain (Typ) - <br /> Sta 27+22 to Sta 30+31 Lt <br /> o *Refer to Plans for Locations Sta 27+62 to Sta 30+31 �Rt� MBGR to Remain (Typ) <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION LIBERTY ROAD RESURFACING Sheet No. <br /> Q AND GENERAL NOTES (Lower Sacramento Road to St. Hwy. Rte. 99) 2 of 4 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.