My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4755 - SP4759
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4755 - SP4759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:21:24 PM
Creation date
1/23/2016 1:19:31 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Elliott Road Resurfacing
Limits
Liberty Road to Sacramento County Line
Year
2010
Project Engineer
J. Clary
Roads Worked
Elliott Rd.
Red Lines
No
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4755 - SP4759
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N (1 <br /> o Const General Notes: <br /> o I1. The Asphalt Concrete shall be placed in two (2) layers of <br /> o Limits of Clearing and Grubbing approximately equal thickness with Pavement Reinforcing Fabric placed <br /> See See on existing or prepared surface. <br /> 1 Shoulder *12 *12 Shoulder 1 2. Placement of Asphalt Concrete overlay shall not begin until the Asphalt <br /> Details I Details 0 Concrete used in Pavement Repair has been in place for 12 hours. <br /> 0 20 Pavement Reinforcing Fabric o <br /> m 0 0.25 AC Overlay I 0 3. All Earthwork (except for final shoulder grading) shall be completed <br /> o ' prior to placing final layer of Asphalt Concrete. No Shoulder Backing <br /> ,VaL V°rte material shall be deposited or drifted on the final layer of Asphalt <br /> Concrete surfacing. <br /> L---------------------- ' --------- ---------J 4. Existing Drainage Facilities shall remain in place unless otherwise <br /> * 13'f (Sta 64+40 to Sta 71+08) T Existing Roadway noted. The Contractor shall conduct earthwork operations so as not <br /> 0 oto modify or obstruct the existing drainage. <br /> Typical Section <br /> Mm Sta 00+75 to Sta 71 +08 5. All existing trees, shrubs, fences, metal beam guard rail and other <br /> o frontage improvements are to remain in place unless otherwise noted. <br /> o m 6. The Contractor shall be responsible for adequately scheduling inspection <br /> CLI and testing of all facilities constructed under this contract. All testing <br /> shall conform to the Standard Specifications. All re—testing shall be <br /> paid by the Contractor. <br /> m <br /> r <br /> r <br /> O <br /> Const 1 , Const <br /> Const <br /> o I 4' Earthwork Var Depth - 13'f <br /> ,—�-12 —13 f Var Depth (Misc Areas) 129 Shld Backing <br /> Shld Backing o n <br /> o0 2, 1 AC Dike <br /> 3 ° I (Type C) I <br /> �,� 3 2 0.25 Shld , <br /> Backing I � <br /> 8% <br /> py ' I <br /> LExisting Roadway Existing Ground <br /> Shoulder Detail 1 Existing Ground L ___ I <br /> Sta 00+75 to 16+00 (Rt) Existing Roadway Existing Roadway <br /> cn Sta 00+75 to 19+50 (Lt) --- <br /> Sta 22+00 to 71+08 (Rt) Shoulder Detail 2 <br /> D Sta 25+00 to 66+00 Lt Shoulder Detail 4 <br /> ( ) Sta 19+50 to 25+00 (Lt) Sta 66+00 to 70+58 <br /> m Sta 16+00 to 22+00 (Rt) (Lt) <br /> V � <br /> r <br /> MTYPICAL SECTION, GENERAL Sheet No. <br /> 0 <br /> 1 1 Z COUNTY OF SAN JOAQUIN NO SCALE NOTES, & SHOULDER DETAILS ELLIOTT ROAD RESURFACING 2 t 5 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE L APPROVAL RE OMMENDED DATE <br /> J. Clary 02/10 Sus-w.,s Y Zll�o y/r►/ro <br />
The URL can be used to link to this page
Your browser does not support the video tag.