My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4760 - SP4769
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4760 - SP4769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:22:42 PM
Creation date
1/23/2016 1:19:38 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Lone Tree Road Resurfacing
Limits
Murphy Road to Van Allen Road and Sexton Road to Brennan Avenue
Year
2010
Project Engineer
E. Silva
Roads Worked
Lone Tree Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4760 - SP4769
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br /> 1 . PLACEMENT OF ASPHALT CONCRETE SHALL NOT BEGIN UNTIL <br /> THE ASPHALT CONCRETE USED IN PAVEMENT REPAIR HAS BEEN <br /> IN PLACE FOR 18 HOURS. <br /> 2. ASPHALT CONCRETE SHALL BE PLACED AS FOLLOWS: 0.25' <br /> OVERLAY: (2) TWO LAYERS OF APPROXIMATELY EQUAL THICKNESS <br /> CO/7St WITH REINFORCING FABRIC PLACED ON THE EXISTING PAVEMENT <br /> LIMITS OF CLEARING AND GRUBBING OR PREPARED SURFACE. 0.17' OVERLAY: (1) ONE LAYER WITH <br /> I REINFORCING FABRIC PLACED ON -EXISTING PAVEMENT OR <br /> PREPARED SURFACE. <br /> 12'—15' 12'—14' <br /> ^' SEE SEE 3. SHOULDER BACKING MATERIAL AT ALL INTERSECTION RADII <br /> SHOULDER I <br /> 22 PAVEMENT REINFORCING FABRIC SHOULDER SHALL RECEIVE PENETRATION TREATMENT AT 0.25 <br /> i /S <br /> DETAILS DETAILS GALLON QUARE YARD. LIMITS OF THE PENETRATION TREATMENT <br /> ON I ON WORK SHALL BE CONFINED TO INTERSECTION--RADII PLUS FIFTY <br /> z 0 SHEET 3 Var I Var SHEET 3 FEET (50') IN EACH DIRECTION OR TO INTERSECTION CONFORM. <br /> m m PAYMENT FOR PENETRATION TREATMENT SHOULD BE <br /> F 77 77 CONSIDERED AS INCLUDED IN THE UNIT PRICE -PAID FOR <br /> M <br /> -4 a <br /> M D I EXISTING ROADWAY I I PENETRATION TREATM=ENT. <br /> mL---------------------- ----------------� <br /> o rn I 4. THE CONTRACTOR SHALL CONDUCT THE SHOULDER BACKING <br /> v� 0.25' AC OVERLAY & OPERATION SO AS NOT TO DISTURB OR OBSTRUCT ANY EXISTING <br /> D 0.17' AC OVERLAY DRAINAGE. <br /> i <br /> 5. ALL EARTHWORK EXCEPT FINAL LIFT OF SHOULDER BACKING <br /> TYPICAL SECTION SHALL BE COMPLETED PRIOR TO PLACING THE ASPHALT <br /> m CONCRETE RESURFACING. NO SHOULDER BACKING MATERIAL <br /> 0 MURPHY RD. TO CARROLTON RD. STA. 104+90 TO STA. 212+60 (0.25' A.C.) <br /> CARROLTON RD. TO VAN ALLEN RD. STA. 212+60 TO STA. 263+41 (0.17' A.C.) SHALL BE DEPOSITED OR DRIFTED ONTO THE ASPHALT CONCRETE <br /> RESURFACING. <br /> SEXTON RD. TO BRENNAN AVE. STA. 316+44 TO STA. 370+79 (0,25' A.C.) <br /> 6. REMOVAL OF A.C. DIKES WHERE SHOWN ON THE PLANS SHALL BE <br /> DONE IN SUCH MANNER AS NOT TO DAMAGE SURFACE BENEATH DIKE. <br /> 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY <br /> Lr ` 3SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES <br /> - CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL CONFORM <br /> TO THE STANDARD SPECIFICATIONS. ALL RE—TESTING SHALL BE PAID <br /> BY THE CONTRACTOR <br /> Site Of `0fr)t�� <br /> m <br /> m <br /> r <br /> m <br /> z <br /> 0 <br /> COUNTY OF SAN JOA UIN NO SCALE TYPICAL SECTION LONE TREE ROAD RESURFACING Sheet No. <br /> Q AND GENERAL NOTES (Murphy Road to Van Allen Road and Sexton Road to Brennan Avenue) 2 of 10 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br /> Enrique Silva 12/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.