My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4790 - SP4803
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4790 - SP4803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:24:20 PM
Creation date
1/23/2016 1:20:29 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Alpine Heights & Gianone Park Area Resurfacing
Limits
Belvedere Avenue: Alpine Avenue to North End Euclid Avenue: Sanguinetti Lane to Belvedere Avenue Golden Gate Avenue: Harding Way to Waterloo Road Harding Way: E Street to Filbert Street Higgins Avenue: Stadium Drive to Belvedere Avenue Stadium Drive: Sanguinetti Lane to Higgins Avenue Vine Street: D Street to Filbert Street
Year
2010
Project Engineer
L. Aguilar
Roads Worked
Belvedere Ave., Euclid Ave., Golden Gate Ave., Harding Wy.
Higgins Ave., Stadium Dr., Vine St.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4790 - SP4803
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Earthwork (Miscellaneous Areas), shall consist of scarifying 3", dressing and <br /> recompacting shoulder area to fill depressions and match edge of pavement. EARTHWORK (MISCELLANEOUS AREAS) <br /> Const GOLDEN GATE AVENUE Various Locations Throughout <br /> r_ n Limits of Clearing and Grubbing Approximately 1,745 LF <br /> i & mailbox relocation <br /> VINE STREET Various Locations Throughout <br /> Varies Varies 4' <br /> D Approximately 2,106 LF <br /> Earthwork Conform <br /> (Misc Areas) Total = Approximately 3,851 LF <br /> Off` <br /> I <br /> i Var _ Var O� Existing <br /> Ground <br /> NOTE: <br /> Existing Roadway �%� %�\\\��\\\��\�\\��\\\��\\ — — — — <br /> 1 . Approximate dimensions and locations used for estimating purposes <br /> ———————————————————— are available upon request. Dimensions and locations are subject <br /> 3" to change at Engineer's discretion. - - <br /> 0 <br /> N <br /> G"J <br /> N fl <br /> Const <br /> Ni C:hst, <br /> — - -- Const <br /> Limits of Clearing and Grubbing - Limits of Clearing and Grubbing <br /> i & Mailbox Relocationr)a1e. ._ ___ & Mailbox Relocation <br /> D A '@+ i sic <br /> 'SWaft DATA_L t SHOULDER DETAIL 2 <br /> 10'—12 4 ,st�F ? ftT.Tp"m5 �', 10'-12' 5't <br /> F <br /> Z ( 0.17' AC Overlay I 0.17' AC Overlay 2' Var Conform <br /> m Var _ Conform <br /> Var ® existing FL <br /> I r Existing Var 8%_ <br /> V Existing <br /> f Ground \t- f Ground <br /> i Existing Roadway } — — — — Existing Roadway <br /> ----------- ----- __ <br /> Variable Depth <br /> Shoulder Backing Variable Depth <br /> Shoulder Backing <br /> a <br /> HARD/NG WAY Sto 15+90 to Sta 17+00 (Lt) Sta 15+90 to Sta 23+00 (Rt) GOLDEN GATE AVENUE Sta 29+40 to Sta 31+60 (Rt) <br /> Sta 18+30 to Sta 20+60 (Lt) Sto 24+08 to Sta 29+44 (Rt) HARD/NG WAY Sta 20+60 to Sta 23+00 Lt Sta 23+20 to Sta 24+08 Rt <br /> Sto 23+20 to Sta 29+44 (Lt) ( ) ( ) <br /> VINE STREET Sta 20+83 to Sta 24+04 (Lt) Sta 15+05 to Sta 20+05 (Rt) <br /> a _BELVEDERE AVENUE Sta 9+90 to Sta 11+30 (Lt) Sto 9+90 to Sta 15+35 (Rt) <br /> ::ESta 25+38 to Sta 26+35 (Lt) Sta 25+38 to Sta 26+35 (Rt) <br /> Sta 14+00 to Sta 15+35 (Lt) Sta 27+90 to Sta 29+84 (Lt) Sta 27+90 to Sta 29+68 (Rt) <br /> M <br /> z <br /> O <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS ALPINE HEIGHTS & GIANONE PARK AREA RESURFACING s6 of 1i4. <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> L. Aguilar 72/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.