My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1013 - SP1019
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP1013 - SP1019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:57:35 AM
Creation date
1/23/2016 12:04:15 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Ahern Road Resurfacing
Limits
I-5 to Bird Rd.
Year
1990
Project Engineer
Larry Violett
Roads Worked
Ahern Road
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1013 - SP1019
Type
Resurfacing
Document Relationships
Ahern Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gil D D <br />,.inform to <br />existing Radii. <br />TYPE <br />Variable depth Asphalt Concrete <br />over existing paved driveway. <br />TYPICAL DRIVEWAY <br />No Scale <br />PLANING <br />ASPHALT <br />Quantities <br />No. <br />CONCRETE <br />PAVEMENT <br />3 <br />158 S.Y. <br />Location <br />Quantity <br />Sta. 17+70 to Sta. 17+95 <br />178 <br />S.Y. <br />Sta. 91+75 to Sta. 92+25 <br />233 <br />S.Y. <br />Bird Rd. <br />60 <br />S.Y. <br />Total <br />471 <br />S.Y. <br />EARTHWORK (Misc. Areas) <br />Location Quantity <br />Sta. 28+00 to Sta. 72+80 45 Sta. <br />z COUNTY OF SAN JOAQUIN No SCALE <br />W <br />Drawn By Date I Project Engineer Date Checked Date I submitt <br />PS. �+ rj 1 5185 � - s/8y 51e9 114'z`-dn <br />IMPORTED BORROW <br />Location Quantity <br />Sta. 28+00 to Sta. 72+80 1,394 C.Y. <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 28+00 to Sta. 72+80 270 Tons <br />DRIVEWAYS <br />Type <br />Quantities <br />No. <br />Area <br />E <br />3 <br />158 S.Y. <br />ASPHALT CONCRETE <br />(Type B) <br />Location <br />Quantity <br />Roadway <br />3,380 Tons <br />Bird Rd. Intersection <br />16 Tons <br />Driveways <br />15 Tons <br />Total 3,411 Tons <br />PAVEMENT REINFORCING <br />FABRIC <br />Location Quantity <br />Sta. 18+20 to Sta. 91+75 19,613 S.Y. <br />CONSTRUCTION DETAILS <br />AND NOTES <br />Date I Ap r v commended Dote <br />0/410 / B� <br />AHERN ROAD RESURFACING <br />1-5 to Bird Rd. <br />Sheet No. I <br />7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.