Laserfiche WebLink
Const. <br /> e Limits of Clearing and Grubbing, and Earthwork (Misc. Areas) • Limits of Mailbox Relocation <br /> e 24' Pavement Reinforcing Fabric * Graveled Shoulder, See General Note 4 <br /> ■ 2'—Sta. 106+00 to Sta. 131+50 Rt. <br /> 12'12' *4' " 2'—Sta. 122+00 to Stu. 126+00 Lt. <br /> � 11'—Sta. 27+00 to Sta. 37+50 <br /> 20'—Sta. 27+00 to Sta. 37+50 <br /> Vor. 8% — Var. Var _ gy Vor <br /> Conform dor. Vor onform <br /> L__________________ <br /> Asphalt Concrete Overlay Existing Roadway <br /> (See Chart Below) GENERAL NOTES <br /> TYPICAL SECTION 1. All earthwork except for finish grading of shoulders and placement of Shoulder <br /> py Sta. 25+00 to Sta. 131 +50 Backing" material shall be completed prior to placing final layer of Asphalt Concrete overlay. <br /> 2. Surplus native material within the limits of Clearing and Grubbing shall be excavated and <br /> used as shoulder embankment throughout the project. This material shall be placed and <br /> J`. compacted prior to hauling Impoort Borrow. <br /> O 3. R—Value and Sand Equivalent requirements shall be waived for Imported Borrow material. <br /> 4. Graveled Shoulders shall be constructed by uniformly placing "Shoulder Backing" material at <br /> a rate of 3 tons per station (each side). The completed graveled shoulder shall be flush <br /> with the edge of pavement. <br /> ASPHALT CONCRETE OVERLAY CHART 5. Where superelevations exist on horizontal curves, the new surface slope and drainage shall <br /> Sta. to Sta. Thickness comform to existing. <br /> 25+00 to 25+50 Var. Depth—Trans. 6. Existing pavement markers may remain in place where overlay thickness is 0.25' or greater. <br /> 25+50 to 40+50 0,17' <br /> 40+50 to 41+50 Var. Depth—Trans. 7. Asphalt Concrete shall be placed as noted below: <br /> 41+50 to 79+00 0.45' 0.17` A.C: 'Thickness— one (1) layer with Pavement Reinforcing Fabric <br /> 79+00 to 80+00 Var. Depth—Trans. on the existing pavement. <br /> 80+00 to 93+00 0.17' <br /> T 93+00 to 94+00 Var. Depth—Trans. 0,30' A.C. Thickness— Two (2) layers of approximate equal <br /> M 94+00 to 101+00 0.45' thickness with Pavement Reinforcing Fabric between the layers. <br /> 701+00 }0 102+00 Var. Depth—Trans. 0.45' A.C. Thickness— Three (3) layers of approximate equal thickness <br /> 102+00 to 127+00 0.30' <br /> P <br /> A 127+00 with Pavement Reinforcing Fabric between the second and top layer. <br /> to 128+00 Var. Depth—Trans. <br /> 128+00 to 131+00 0.17' 8. Placement of the first layer of Asphalt Concrete Surfacing shall not begin until Asphalt <br /> 131+00 to 131+50 Var. Depth—Trans. Concrete used in Pavement Repair has been in place for a minimum of 36 hours. <br /> 9. Asphalt Concrete used for Pavement Repair shall be placed in layers which do not <br /> exceed 0.50' in compacted thickness. <br /> s <br /> ' m 10. Survey Monument Frame and Cover shall be adjusted to finished grade at Sta. 78+72f. <br /> D <br /> Exact location to be determined by the Engineer. <br /> ti COUNTY OF SAN JOAQUIN WOODWARD AVENUE RESURFACING Sheet No. <br /> -u <br /> NO SCALE TYPICAL SECTION Oakwood Lake to Airport W 2 of S <br /> Drawn By Data v.proj•et Enetnttr Data Checked Dot. Submitted Date Approval Recommended Date <br />