Laserfiche WebLink
PAVEMENT REPAIR IMPORT BORROW ASPHALT CONCRETE <br /> (Type B) <br /> Location Quantity Location Quantity Location Quantity <br /> 12 sites throughout 212 S.Y. Sta. 25+00 to Sta. 131+50 2,787 C.Y. Roadway 6,101 Tons <br /> project Pavement Repair 117 Tons <br /> Intersection 17 Tons <br /> Driveway 227 Tons <br /> Total 6,462 Tons <br /> PLANING ASPHALT SHOULDER BACKING PAVEMENT REINFORCING <br /> CONCRETE PAVEMENT FABRIC <br /> Location Quantity Location Quantity Location Quantity <br /> Sta. 25+00 to Sta. 25+25 64 S.Y. <br /> Sta. 131+25 to Sta. 131+50 67 S.Y. Sta. 25+00 to Sta. 131+50 639 Tons Sto. 25+50 to Sta. 131+00 27,666 S.Y. <br /> Total 131 S.Y. <br /> DRIVEWAYS <br /> RIVEWAYS DRA <br /> o m (Miscellaneous Areas) - <br /> a <br /> Type <br /> e Quantities J Gu,pa� <br /> 0 ; Location Quantity No. Area <br /> m <br /> Sta. 25+00 to Sta. 131+50 106.5 Sta. D 15 736 S.Y. <br /> E 6 448 S.Y. <br /> ;tel a <br /> e4 <br /> m <br /> s <br /> ti COUNTY OF SAN JOAQUIN WOODWARD AVENUE RESURFACING Sheet No. <br /> NO SCALE CONSTRUCTION NOTES Oakwood Lake to Airport WayS of S <br /> Drawn By Data I Project Enetater Dale Checked Dot. I Submitted Dorn A roval R ommended Date <br /> 13. 6190 r/90 .fu..,,,a,$ G/90f4-,d r �y9a <br />