My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1034 - SP1042
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP1034 - SP1042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 1:07:34 PM
Creation date
1/23/2016 12:04:56 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Newcastle Road Resurfacing
Limits
Arch Road to South End
Year
1990
Project Engineer
Larry Violett
Roads Worked
Newcastle Road
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1034 - SP1042
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. GENERAL NOTES <br /> Limits of Clearing and Grubbing and Earthwork (Misc. Areas) 1. The contructor shall conduct his earthwork operation as to <br /> not obstruct existing drainage. <br /> ■ 12' I <br /> 12' 2. All earthwork except for finish grading of shoulders and <br /> placement of "Shoulder Backing material shall be completed <br /> prior to placing final layer of Asphalt Concrete overlay. <br /> 3. R—Value and Sand Equivalent requirements shall be waived for <br /> Imported Borrow material. <br /> Conform Conform 4. Graveled Shoulders shall be constructed by uniformly placing <br /> gy, Var. Var____ 89' "Shoulders Backing" material at a rate of 3 tons per station <br /> Vat Var, (each side). The completed graveled shoulder shall be flush <br /> with the edge of pavement. <br /> Lt-0.45' <br /> -1 <br /> 0 Limits of mailbox 5. Asphalt Concrete Surfacing shall be placed in three (3) layers <br /> relocation Existing Roadway Asphalt Concrete Surfacing of approximate equal thickness. <br /> ■ Graveled Shoulder—See TYPICAL SECTION 6. Placement of the first layer of Asphalt Concrete Surfacing <br /> General Note 3. shall not begin until Asphalt Concrete used in Asphalt Concrete <br /> Sta. 73+85 to Sta. 104+00 Base has been in place for a minimum of 36 hours. <br /> Sta. 112+00 to Sta. 131+50 7. Survey Monument Frames and Covers shall be laced at <br /> Sta. 139+00 to Sta. 152+70 Sta. 100+00± and Sta. 126+45t. Exact location to be <br /> C determined by the Engineer. <br /> Const. <br /> Limits of Clearing and Grubbing and Earthwork (Misc. Areas) <br /> —0414- 12' --t— 2' <br /> D <br /> D <br /> Conform <br /> Conform <br /> _ 87 2% <br /> JOT. 2%� 89, <br /> Var. <br /> m <br /> r <br /> m i � <br /> Existing Roadway 0.45' As halt Concrete SurfacingKECORD DRAWING <br /> >0rrecfi0ns By _ <br /> Var. Depth Asphalt Concrete Base No Changes By <br /> TYPICAL SECTION F1 — <br /> F- ete <br />° Sta. 104+00 to Sta. 112+00 Anv Person Using This Drzlaing Should Veflf4 <br /> Sta. 131+50 to Sta. 139+00 "fnrmpati0n Fi f .^ -c (� ri! <br /> o e5�t, W-rr►� <br /> COUNTY OF SAN JOAQUIN Na SCALE TYPICAL SECTION NEWCASTLE ROAD RESURFACING Sheet No, <br /> Arch Road to south end 2 of 9 <br /> Drawn iv Date I Pro,lect Enpineer Lpate ChecketlDo}e Subnl{ted Date A o al Recommended <br /> Pat* <br /> 1-.S-/ <br /> s/90 1 / /ae/b Nw <br />
The URL can be used to link to this page
Your browser does not support the video tag.