Laserfiche WebLink
PAVEMENT REPAIR SHOULDER BACKING ASPH41-TCONCRETE <br /> Location Quantity Location Quantity Location (Type <br /> BB)) Quantity <br /> 80 sites throughout 2,210 S.Y. Sta. 73+85 to Sta. 152+70 474 Tons Roadway 6,300 Tons <br /> project <br /> Intersections 295 Tons <br /> Driveways 213 Tons <br /> Total 6,808 Tons <br /> PLANING ASPHALT DRIVEWAYS (Type D) ASPHALT CONCRETE <br /> CONCRETE PAVEMENT Location Quantity BASE (Type B <br /> Location Quantity ( ) <br /> Sta. 98+49 (Rt.) 71 S.Y. Location Quantity <br /> Sta. 73+95 Rt. 23 S.Y. Sta. 102+10 (Rt.) 142 S.Y. <br /> Sta. 109+70f to Sta. 110+00± Rt. 13 S.Y. Sta. 104+45 (Rt.) 71 S.Y. Sta. 104+00 to Sta. 112+00 654 Tons <br /> Sta. 115+42t to Sta. 118+02t Rt. 116 S.Y. Sta. 105+48 (Lt. 61 S.Y. Sta. 131+50 to Sta. 139+00 592 Tons <br /> Sta. 152 +60 to Sta. 152+70 42 S.Y. Sta. 106+43 (Lt. 61 S.Y. Pavement Repair 917 Tons <br /> Total 194 S.Y. Sta. 109+67 ((Lt.)))))) 35 S.Y. Total 2,163 Tons <br /> Sta. 115+84 (Lt.) 61 S.Y. <br /> Sta. 123+28 (Lt.) 101 S.Y. <br /> Total 603 S.Y. PLACE MONUMENT <br /> EARTHWORK <br /> FRAMES and COVERS(Miscellaneous Areas) Location QuantitSta. 100+00t 1 Each <br /> Location Quantity DRIVEWAYS (Type E) Stu. 126+45t 1 Each <br /> o Sta. 73+85 to Sta. 152+70 79 Sta. <br /> Total 2 Each <br /> Location Quantity <br /> Sta. 73+85 95 S.Y. <br /> m Sta. 102+67 (Lt.) 43 S.Y. <br /> r' Sta. 114+80 (Lt.) 39 S.Y. <br /> m Sta. 118+15 (Lt.) 47 S.Y. <br /> Z <br /> D IMPORTED BORROW Sta. 119+63 (Lt.) 51 S.Y. _ <br /> Sta. 121+37 (Lt.) 31 S.Y. <br /> Quantity - <br /> m Location Sta. 121+95 N. 51 S.Y. J•� �gSPOi'� <br /> Stu. 125+68 (Lt.) 43 S.Y. <br /> Sta. 128+11 (Rt.) 76 S.Y. <br /> y c Sta. 73+85 to Sta. 152+70 3,083 C.Y. <br /> A Total 467 S.Y. _�, k s•t_ <br /> D <br /> E <br /> M <br /> A <br /> w COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION NOTES NEWCASTLE ROAD RESURFACING SheetNo. <br /> Arch Road to south end 9 of 9 <br /> D11r�n�rn B Date te_L Checketl I Dnte SubHttetl Dote A rova Reconnrntled Date <br />