Laserfiche WebLink
Conform at E.P. <br /> PAVEMENT REPAIR SHOULDER BACKING <br /> 8' Location Quanti Location Quantity <br /> Existing 2 sites throughout project 30 S.Y. Sta. 120+56 to Sta. 175+50 330 Tons <br /> Width Conform Sta. 175+50 to Sta. 177+21 4 Tons <br /> 0.30' Asphalt Concrete over Sto. 182+57 to Sta. 183+75 3 Tons <br /> shaped and compacted native material. Sta. 183+75 t0 Sta. 204+00 114 Tons <br /> TYPED PLANING ASPHALT <br /> Total 451 Tons <br /> Conform at E.P. CONCRETE PAVEMENT <br /> Location Quanfity <br /> * Sta. 120+56 to Sta. 120+81 133 S.Y. <br /> s *� *R - Conform to Ste. 178+64 to Ste. 179+14 178 S.Y. DRIVEWAYS (Type D) <br /> existing radii Sta. 180+36 to Sta. 180+86 178 S.Y. <br /> Existing Conform Location Quantity <br /> y <br /> Width <br /> Live Oak Rd. Intersection 133 S.Y. <br /> variable depth Asphalt Concrete Sta. 203+50 to Sta. 204+00 133 S.Y. 9 sites throughout projrct 211 S.Y. <br /> over existing paved driveway. <br /> TYPE E Total 755 S.Y. <br /> DRIVEWAYS (Type E) <br /> �4' — Ste. 175+30 to Ste. 177+21 <br /> and Sta. 182+57 to Sta. 183+75 Location Quantity <br /> TYPICAL DRIVEWAYS EARTHWORK (Misc. Areas) 15 sites throughout project ^,73 S.Y. <br /> Location Quante <br /> n Sta. 120+56 to Sto. 175+50 55 Sta. <br /> o See Note Below Sta. 183+75 to Ste. 204+00 21 Sta. ASPHALT CONCRETE <br /> r Existing Surface <br /> jj Total 76 sta. (Type B) <br /> Location Quanti <br /> Roadway4,354 Tons <br /> Z -- IMPORTED BORROW Live Oak Rd. Intersection 125 Tons <br /> o.50' Asphalt concrete Driveways — Type D 48 Tons <br /> Location Quantity Driveways — Type E 66 Tons <br /> PAVEMENT REPAIR DETAIL Ste. 120+56 to 175+50(Lt. & Rt.) 1 ,416 C.Y. Pavement Repair 10 Tons <br /> A Ste. 183+75 to 204+00(Lt. & Rt.) 442 C.Y. <br /> £ NOTE: width, length and locations Total 1 ,858 C.Y. I Total 4,603 Tons <br /> m to be determined by Engineer. <br /> COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS ALPINE ROAD RESURFACING Sheet No. <br /> AND NOTES Eight Mile Road to Live Oak Road 5 OF 5 <br /> Drawn By Dote Project Engineer Date Checked Date Submltted Dote A rov commended Date <br /> '3. `�.}lc rJ9i IIgARAn 14,uua 2(91 Z/9i �Z�vrr�,�itiv �/r�i fi <br />